SELF STUDY PROFESSIONAL DEVELOPMENT ONLINE LEARNING RESOURCES MATERIALS AND SELF ASSESSMENT ONLINE TESTS FOR ASSISTING THE CANDIDATES TO PREPARE FOR PROFESSIONAL ENGINEER (ELECTRICAL-BUILDING SERVICES) REGISTRATION WITH MYANMAR BOARD OF ENGINEERS

Prepared BY-  U Kyaw Naing

                          Registered Professional Engineer of Queensland

                          RPEQ-Electrical (Registration Number 07661)

                          Board of Professional Engineers of Queensland State

                          Government  (Australia)  www.bpeq.qld.gov.au

                            &

                         Electrical Engineering Teacher (TAFE-NSW) (Australia)

Based on 25 years experiences since BE (Electrical Power) Graduation from Yangon Institute of Technology in 1987 as electrical engineer, electrician and electrical engineering teacher in Myanmar, Fiji, Australia, New Zealand & Niue, these online electrical learning materials in line with the study materials being used to teach the engineering courses in Australia are prepared to assist Young Myanmar Engineers to participate in professional development programs of Myanmar Engineering Society  to accomplish the aims & objectives of Myanmar Engineers Board in the process of Professional Engineers Registration in Myanmar.

Online tests and assessments are also included for the candidates to assess their self learning. The resources are not only theoretical studies but also industrial rules and regulations in Singapore, UK , Australia and New Zealand and practical resources of engineering practice.  PEng registration competency report writing in Australia & New Zealand are also included in the resources. Engineering Report Writing.zip & (Engineering Competency Report Submitted by U Kyaw Naing for Registered Professional Engineer of Queensland, Australia).  Browse http://www.electricaldiploma2013.zoomshare.com/ for details of Australian Electrical Training.

Members of Myanmar Engineering Society at the grade of Junior Member can utilize the materials uploaded to this site at free of charge for online self learning & self assessment. The candidates should have good internet access to download the study support materials from this site.  But for sending the materials in USB or copying them from the authorised representatives in Myanmar or assessing and providing individual professional support by e-mail, appropriate fees can be chargeable.

Further contact should be made to: U Kyaw Naing at highlightcomputergroup1@ gmail.com                                                                                                             

SCOPE- Electrical PE (Building Services)

PART  (1)

YEAR 1 & 2  (Minumum 3 to 4 years is required for a graduate to become a PE)

( Total PDP Points for Informal Learning Activities-Private Study Part Time) ( Total 10 points per year maximum)(MEB-PE Regulation Appendix 3). Ctrl+Click the link & then allow to download the contents.

The self study learning resources materials for SCOPE – Electrical PE (Building Services)

The tests are based on your general knowledge on the subject. They are not designed to test the limited area of study that the candidate learns one paper & sits one test.

1.Basic Electricity

  1. DC Circuit
  2. Alternating (sinusoidal) Voltage and current
  3. Single phase AC Circuit
  4. Phasor Algebra and AC Circuit
  5. Resonance in RLC Circuit

STUDY MATERIALS  (DC Circuits)

DC_Circuit_E003_E004.zip

http://www.filefactory.com/file/c0cb8ab/n/Stage_1_Part_1.zip     

ONLINE MCQ TEST (1)

http://www.filefactory.com/file/58r3nfe1qieh/n/E003_E004_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/3ebb0fe603a748b6b2430e75fb07af4f#/InitializeTest.xaml

http://www.classroomclipboard.com/503511/Home/Test/3ebb0fe603a748b6b2430e75fb07af4f#/QuestionPresenter.xaml?id=11

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- G4UYTV

STUDY MATERIALS (AC Circuit 1)

G002

 

ONLINE MCQ TEST (2)

http://www.filefactory.com/file/7ebmnciqxmf3/n/G002_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/f7fb9a22d8ba413a8d39bc6ef7be4d20#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- 8YGTHT

STUDY MATERIALS (AC Circuit 2)

G048_7769AC          G048_Tutorials.zip

Notes for assignment/ tutorials

G048_Full_Part_1.zip             G048Part2.zip

E025_Circuits_1                      E025_Circuits_2

E025_Tutorial

Stage 2 Part 3.zip   http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip

 

Stage 3 Part 2.zip   http://www.filefactory.com/file/c0ccdbc/n/Stage_3_Part_2.zip

 

ONLINE MCQ TEST (3)

http://www.filefactory.com/file/52h82a0t0f3f/n/E025_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/0d8e41400b24465b97e60b2a555d7cff#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- DCVK7

ONLINE MCQ TEST (4)

http://www.filefactory.com/file/713uvwk5vbel/n/G048_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/a03f83dbf40e4991800c44b484ae6a1d#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- G9PLM

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2 HR

2. Three phase Circuits and System

  1. Three phase voltage generation
  2. Phasor diagram
  3. Star/ Delta connection
  4. Balanced Three phase loads
  5. Active , Reactive and Apparent Power
  6. Power Measurements
  7. Power Factor Correction

STUDY MATERIALS (Three Phase Circuits)

G049_7762AB_7761M_Notes           G049_7762ABTutorial

E029_Motor_Control_1                       E029_Motor_Control_2

Fault Calculation

7762AB_Fault_Calculation.zip

AB-Part1.zip AB-Part_2.zip AB-Part_3.zip AB-Part4.zip AB-Part5.zip AB-Part6.zip

ABFormula.zip

Power System Analysis

7761M-Part1.zip 7761MPart-2.zip 7761M-Part-3.zip 7761M-Part-4.zip 7761M-Part-5.zip

7761M-Part-6.zip 7761M-Part-7.zip

Phase AC Supply Handout    

Connection of balanced three phase loads handout

Star delta conversion handout     

Connection of unbalanced three phase loads

 

Power and energy in ac circuit handout

 

Watt meter handout

 

Three Phase Power Handout        

 

  Power factor correction handout

 

High voltage transmission line losses handout

 

Symmetrical components handout   

 

Distribution of fault currents through power system handout

 

Phase sequence diagrams for power systems handout

 

Phase sequence detectors handout,  

 

Fault calculations on power system handout

Power Circuits (Reference)

Part 1

Part 2

Part 3

Part 4

Part 5

Part 6

Part 7

Part 8

Part 9

Part 10

Part 11

Part 12

Part 13

Part 14

Part 15

Part 16

Part 17

Part 18

Stage 2 Part 3.zip    http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip

E029Tutorial

 

ONLINE MCQ TEST (5)

G049 Test 1

http://www.filefactory.com/file/5vhbs8sn20f3/n/G049_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/d5b2138544c74b709963660627046ffe#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- UE6FAG

G049 Test 2

http://www.filefactory.com/file/611ftvpa3dit/n/G049_Online_Test_2_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/797cac44d12248b9b3be8507518c9bc4#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- PS83

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2 HR

3. Magnetism and Magnetic Circuits

  1. Magnetic Field
  2. Magnetic Materials and Magnetization curves
  3. Magnetic Equivalent Circuit
  4. Sinusoidal Excitation
  5. Magnetic losses

STUDY MATERIALS  (Magnetic Circuits)

G001_Part_1     G001_Part_2     G001_Part_1  G001_Part_2

http://www.filefactory.com/file/cf9b277/n/G001.zip

http://www.filefactory.com/file/c0cc1cd/n/Stage_1_Part_4.zip

ONLINE MCQ TEST (6)

G001 Test 1

http://www.filefactory.com/file/7c658zyrj9gx/n/G001_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/ec4d44c4f8004474b48ceafa43b2e228#/InitializeTst.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- BDL8L85

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 2 HR x 0.5 = 1 HR

 

 

 

4.AC/DC Machines

  1. DC Machine: operating principle, voltage and torque equations
  2. Three phase Induction motors: operating principle, equivalent Circuit, torque-speed, Characteristics, losses and efficiency

STUDY MATERIALS  (AC/DC Machines)

Elect Machine-G043+G044+G045.zip  http://www.filefactory.com/file/c0b6668/n/Elect_Machine-G043_G044_G045.zip

G043_G045_7762AF_Notes  G043_G045_Part_1_7762AF_Notes

G015_G046_G040_G043_G045_G042Tutorials

ESI12_14_Syn_Motor_Generator.zip   ESI_13_Voltage_regulation_devices.zip

ESI_19.4_Turbine_Control.zip

ESI_19.2_Generator_Control_Load_Flow.zip

ESI_19.3_Generator_.zip

Synchronous Generator

Advanced AC Machines

AF_Wk_1-2.zip AF_Wk_2-3.zip AF_Wk_4.zip AF_Wk_5.zip AF_Wk_6.zip AF_Wk_7.zip AF_Wk_8.zip

AF_Wk_9.zip AF_Wk_10.zip AFWk11-12-13Part1.zip AFWk11-12-13Part2.zip AF_Wk_14.zip

AF_Wk_15.zip AF_Week_16.zip AF_wk_17.zip

Motor_Lab.pdf

Principle_of_Synchronous_motors.doc

SyncMotorsPowerControl.pdf

G043_G045_7762AF_Notes      G043_G045_Part_1_7762AF_Notes

MachineControlCkt1.zip      MachineControlCkt2.zip      MachineControlCkt3.zip

Motor control 2       Motor control 3       Motor control 4     Motor control 5 

Motor control 6       Motor control 7       Motor control 8     Motor control 9

Motor control 10     Motor control 11     Motor control 12   Motor control 13 

Motor control 14     Motor control 15     Motor control 16

E029_Motor_Control_1     E029_Motor_Control_2    E047Mech

Advanced DC Machines

G044_7762AC1      G044_7762AC2

http://www.filefactory.com/file/cf9a3a6/n/E029.zip

ONLINE MCQ TEST (7)

G043+G045 Test

http://www.filefactory.com/file/7h9o99zngfq1/n/G043_G045_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/2f02528bbe5d47ba8056aaeae1c66972#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- 7TBWXJ5

G044Test

http://www.filefactory.com/file/5iyno92bji67/n/G044_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/39a2497862a448b1b34e39893dd92183#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- VH4D

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2 HR

5.Transformers

  1. Ideal Transformer
  2. Equivalent circuit
  3. Phasor Diagrams
  4. Determination of Parameters
  5. Performance Evaluation
  6. Auto-transformers
  7. Three phase Transformers

STUDY MATERIALS  (Power Transformer)

Power Transformer+Line-G040.zip 

G040_7762AD_Notes

New-AA_AB_AD_AE_AF_AG_AH_4269T_Tutorials

ESI_4_11_Power_Transformer.zip

ESI_4_Power_Transformer.zip

7762AD Power Transformer

AD_Day_1.zip AD_Day_2.zip AD_Day_4.zip AD_Day_5.zip AD_Day_6.zip

AD_Day_8.zip AD_Day_9.zip

Power Transformer Reference

TrRef1.zip TrRef2.zip TrRef3_0.zip TrRef4.zip TtrRef5.zip TRRef6.zip

TrRef7.zip TrRef8.zip TrRef9.zip

 

ONLINE MCQ TEST (8)

G040 Test 1

http://www.filefactory.com/file/3ve7iz9640yp/n/G040_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/b12e17211b8b407b9cac0025aff7462c#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- 67VWMYJ

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2 HR

6.Active Power and Frequency Control

  1. Governor Control Systems
  2. Transmission Losses , penalty factors and loss coefficients
  3. Automatic Generation Control
  4. Active power Control Devices

STUDY MATERIALS  (Power Frequency Control  1 )

ESI12_14_Syn_Motor_Generator.zip          ESI_13_Voltage_regulation_devices.zip

ESI_18.1_Substation_equipments_1.zip     ESI_18.2_Substation_equipments_2.zip    

ESI_18.3_Substation_equipments_3.zip     ESI_33.3_Harmoniceffect_on_machines.zip

ESI_33.4_Harmonic_in_synchronous_machines.zip                    

ESI_33.5_Harmonic_in_transformer.zip

ESI_33.6_Power_Quality_Improvement_Capacitor_bank.zip

ESI_33.7_Power_Quality_Improvement-Filter.zip

ESI_33.8_Power_Quality_Improvement-General.zip                

ESI_33.9_Power_Quality_Improvement-Power_Conditioner.zip

Stage 2 Part 1A.zip   http://www.filefactory.com/file/c0cb96f/n/Stage_2_Part_1A.zip

 

Stage 2 Part 3.zip   http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip

 

ESI12_14_Harmonic     ESI12_14_Reactor     ESI12_14_Syn_Motor_Generator     

ESI_19.1_Computer_Control        ESI_19.4_Turbine_Control

ESI_19.2_Generator_Control_Load_Flow      

ESI_19.3_Generator        ESI_22.1_Generator_Study      ESI_22.2_Voltage_surge_control

ESI_24_Modern_Power_System

Lesson 1

Lesson 3

Power System Operation (General aspect) Reading 1  

Power System Operation (General aspect) Reading 2

Power System Operation (General aspect) Reading 3

Power System Operation (General aspect) Reading 4

Power System Operation (General aspect) Reading 5

Power System Operation (General aspect) Reading

http://kyawnaing325.zoomshare.com/files/7762ElectricalPowerModules.htm 

 

7762AH Power System Fundamental

7762AH Power System Fundamental   

AH_Day_1.zip     AH_Day_2_3.zip     AH_Day_4.zip    AH_Day_5.zip    AH_Day_6_7_8.zip

Stage 3 Part 3.zip   http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip 

7.Reactive Power and Frequency Control

  1. Production and Absorption of Reactive Power
  2. Methods of Voltage Control
  3. Reactive Power and Voltage Control Devices
  4. Application to Transmission and Distribution Systems

STUDY MATERIALS  (Power Frequency Control  2)

G015_G037_G038_G030Pt1_7762AG_Notes     G015_G042_G037_G038_G039_Part_2_Notes

G015_G042_G037_G038_G039_Part_2_Notes  G015_G037_G038_G030Pt1_7762AG_Notes

Power system 2-G037+G038+G039.zip

http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip

Power system 2-G037+G038+G039.zip  

http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip

Transmission line-G042.zip  

http://www.filefactory.com/file/c0b7dad/n/Transmission_line-G042.zip

G042_Part_3_Notes     G037_G038_G030Pt1_7762AG_Notes

ONLINE MCQ TEST (9)

G037+G038+G039 Test 1

http://www.filefactory.com/file/6o7ow8er4f9l/n/G037_G038_G039_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/9696759cec624be1a7793b7d1edd87c2#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- HYCEUE

ONLINE MCQ TEST (10)

G037+G038+G039 Test 2

http://www.filefactory.com/file/5by85g9rxmoh/n/G037_G038_G039_Online_Test_2_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/8ea510a583bf41b5b6a994378eeb912f#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- LCCD

ONLINE MCQ TEST (11)

G037+G038+G039 Test 3

http://www.filefactory.com/file/5fy0regqoh0n/n/G037_G038_G039_Online_Test_3_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/adae49f2f39c4158925fe7010b460540#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- S947G

ONLINE MCQ TEST (12)

G037+G038+G039 Test 4

http://www.filefactory.com/file/q1sn4hitpjb/n/G037_G038_G039_Online_Test_4_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/f1486f63ce8f4e349919659cd7bd4a98#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- 49JL

ONLINE MCQ TEST (13)

G037+G038+G039 Test 5

http://www.filefactory.com/file/738vtwzyd3qp/n/G037_G038_G039_Online_Test_5_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/029dcf4b117c47109ff8d981a108e5c6#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code--- KV6K3G                                                                                                                     After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 8 HR x 0.5 = 4HR

8.Electric Power Distribution Systems

  1. Distribution System Configuration
  2. Primary and Secondary Distribution
  3. Ring , Radial and Inter-connected Systems
  4. Distribution System Layout
  5. Planning Criteria and Network Design
  6. Fault Diagnosis and Restoration of Supply

STUDY MATERIALS  (Electrical Power Distribution)

Electrical Distribution Typed Notes

AA_Typed_Note_1.doc       AA_Typed_Note_2.doc    AA_Typed_Notes_3-.doc 

7762AA_Typed_Note_4.doc

AA_Typed_note_5.doc      AA_Typed_note_6.doc    AA_typed_note_7.doc      

AA_typed_note_8.doc     7762AA_Module_Book

Power System 1-G015+G046+A010 

 

AA.zip

 

http://www.filefactory.com/file/c0b7e92/n/AA.zip

 

 

AE.zip

 

http://www.filefactory.com/file/c0b7ff7/n/AE.zip

 

 

AG.zip

 

http://www.filefactory.com/file/c0b7f21/n/AG.zip

 

 

A010.zip

 

http://www.filefactory.com/file/c0b7f3c/n/A010.zip

AA_AB_AD_AE_AF_AG_AH_4269T_Tutorials

ESI_8_Insulation_1.zip 

ESI_8_Insulation_2.zip

ESI_25_27_31_32_Part_2_Installation_and_testing_0.zip 

 ESI_25_27_31_32_Part_3_Electrical_Drawing.zip

ESI_25_27_31_32_Part_4_Data_Com_and_Wiring.zip 

ESI_25_27_31_32_Part_5_Installation_Work_Books.zip

ESI_25_27_31_32_Part_6_Switching_1_2.zip

ESI_25_27_31_32_Part_7_Switching_3_4.zip

ESI_25_27_31_32_Part_8a_Electrical_Installation_Requirement_1.zip

 ESI_25_27_31_32_Part_8b_Electrical_Installation_Requirement_2.zip

ESI_9.1_Protection_Relay_Construction.zip                             

ESI_9.2Test_Equipment.zip

Study Package (10) HV Equipments

ESI10.1_HV_equipments.zip                                                           

ESI10.2_Substation_equipments.zip

Study Package (12) Harmonics

ESI12_14_Harmonic.zip                                

ESI12_14_Reactor.zip                    

ESI12_14_Syn_Motor_Generator.zip

Study Package (13) Voltage Regulation   3333

ESI_13_Voltage_regulation_devices.zip

Study Package (18) Sub station equipments

ESI_18.1_Substation_equipments_1.zip    

ESI_18.2_Substation_equipments_2.zip    

ESI_18.3_Substation_equipments_3.zip

Study Package (33) Power Quality

ESI_33.1_Power_Quality_Concept.zip        

ESI_33.2_Harmonic_in_capacitor.zip         

ESI_33.3_Harmoniceffect_on_machines.zip

ESI_33.4_Harmonic_in_synchronous_machines.zip                 

ESI_33.5_Harmonic_in_transformer.zip

ESI_33.6_Power_Quality_Improvement_Capacitor_bank.zip

ESI_33.7_Power_Quality_Improvement-Filter.zip

ESI_33.8_Power_Quality_Improvement-General.zip                

ESI_33.9_Power_Quality_Improvement-Power_Conditioner.zip

Study Package (34) Power Equipments Commissioning

ESI_34.1_Power_Eqpt_Commissioning_1.zip   

ESI_34.2_Power_Eqpt_Commissioning_2.zip    

ESI_34.3_Power_Eqpt_Commissioning_3.zip

ESI_34.4_Power_Eqpt_Commissioning_4.zip  

ESI_34.5_Power_Eqpt_Commissioning_5.zip    

ESI_34.6_Power_Eqpt_Commissioning_6.zip

ESI_34.7_Power_Eqpt_Commissioning_Trade_1.zip

ESI_34.8_Power_Eqpt_Commissioning_Trade_2.zip

ESI_34.9_Power_Eqpt_Commissioning_Trade_3.zip

ESI_34.10_Power_Eqpt_Commissioning_Trade_4.zip

ESI_34.11_Power_Eqpt_Commissioning_Trade_5.zip         ESI_34.12_Power_Eqpt_Commissioning_Trade_6.zip

ESI_34.13_Power_Eqpt_Configuration_1.zip                          

ESI_34.14_Power_Eqpt_Configuration_2.zip

Study Package (34) Equipments Commissioning ESI_34.1_Background_theory_for_equipments_commissioning_1.zip

ESI_34.2_Background_theory_for_equipments_commissioning_2.zip

ESI_34.3_Background_theory_for_equipments_commissioning_3.zip

ESI_34.4_Background_theory_for_equipments_commissioning_4.zip

ESI_34.5_Background_theory_for_equipments_commissioning_5.zip

ESI_34.6_Background_theory_for_equipments_commissioning_6.zip

BACK UP FOR 2& 10

Stage 2 Part 1A.zip   http://www.filefactory.com/file/c0cb96f/n/Stage_2_Part_1A.zip

 

Stage 2 Part 3.zip   http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip

 

Switch Gear   

Elect_Installation_Protection_Method_Devices.zip

ElectSystSafety1.zip    

ElectSystSafety2.zip                 

ESI_27.4Circuit_Breaker_1.zip    

ESI_27.5_Circuit_Breaker_2.zip

ESI_7_Switching_system_design_consideration.zip    

ESI_8.2_Site_Insulation_Surge_Protection.zip  

ONLINE MCQ TEST (14)

G015+G046 Test 1

http://www.filefactory.com/file/50ox6xeklufp/n/G015_G046_Online_Test_1_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/67dbfd25caa3484498a850f3b1050457#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code -----G9UCJ

ONLINE MCQ TEST (15)

G015+G046 Test 2

http://www.filefactory.com/file/1s822zs1jz89/n/G015_G046_Online_Test_2_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/204b4231f0ea4492986ce2ec11302704#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code -----FSXU

ONLINE MCQ TEST (16)

G015+G046 Test 3

http://www.filefactory.com/file/6pcivv5e0y05/n/G015_G046_Online_Test_3_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/542fb0501a334d8788c68c19208e96e1#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code -----JE3W

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 4 HR x 0.5=2HR

9.Building Services Engineering

  1. Estimation of Power Demand
  2. LV Cable and Bus-way Systems
  3. Conductor Sizing Factors
  4. Circuit Protective Conductor
  5. Earth Leakage and Touch Voltage
  6. Inspection and Testing
  7. Lightning Protection

STUDY MATERIALS  (Building Service Engineering)

Wiring_Notes_1.                   Wiring_Notes_2                Switchboard_Wiring   

 1Wiring_E033_E008         2Wiring_E033_E008

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

Stage 1 Part 1.zip    http://www.filefactory.com/file/c0cb8ab/n/Stage_1_Part_1.zip

                                Stage 1 Part 5.zip  http://www.filefactory.com/file/c0cb9b3/n/Stage_1_Part_5.zip

Electrical_safe_working.zip

NREL_Disconnect_Reconnect.zip 

Stage 1 Part 5.zip  http://www.filefactory.com/file/c0cb9b3/n/Stage_1_Part_5.zip

Stage 1 Part 1.zip  http://www.filefactory.com/file/c0cb8ab/n/Stage_1_Part_1.zip

ELV_Cable_termination     ELV_Cable_termination    Wiring_Notes_1.  Wiring_Notes_2     Switchboard_Wiring

1Wiring_E033_E008     2Wiring_E033_E008

ElectricalDrawing1.zip     ElectricalDrawing2.zip    ElectricalDrawing3.pdf

Stage 2 Part 2A.zip

http://www.filefactory.com/file/c0cca4a/n/Stage_2_Part_2A.zip

Construction ElectricalSafety.zip

InserviceTesting.zip

Wiring_Notes_1.    Wiring_Notes_2    Switchboard_Wiring    1Wiring_E033_E008    2Wiring_E033_E008

BACK UP FOR 9 & 10

Stage 2 Part 1B.zip http://www.filefactory.com/file/c0ccac0/n/Stage_2_Part_1B.zip

 

Stage 2 Part 3.zip  http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip

 

Stage 2 Part 6.zip  http://www.filefactory.com/file/c0cccc0/n/Stage_2_Part_6.zip

 

Stage 3 Part 3.zip  http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip

 

Stage 3 Part 4.zip  http://www.filefactory.com/file/c0ccd9a/n/Stage_3_Part_4.zip

 

Stage 4 Part 8.zip  http://www.filefactory.com/file/c0cc5a1/n/Stage_4_Part_8.zip

 

Stage 4 Part 9.zip  http://www.filefactory.com/file/c0cc5db/n/Stage_4_Part_9.zip

 

Stage 4 Part 10.zip http://www.filefactory.com/file/c0cc5f8/n/Stage_4_Part_10.zip

 

Stage 3 Part 5.zip  http://www.filefactory.com/file/c0ccefd/n/Stage_3_Part_5.zip

 

Stage 3 Part 8.zip  http://www.filefactory.com/file/c0ccf09/n/Stage_3_Part_8.zip

 

Stage 3 Part 9.zip  http://www.filefactory.com/file/c0ccf48/n/Stage_3_Part_9.zip

 

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

 

 

AS3000-2007Overview.zip  

AS3000_AS3008TablesExtract.zip  

  WiringRules.zip

Part (1) Study the following notes

 Installation_Requirement_1-A.zip

 Installation_Requirement_1-B.zip

 Installation_Requirement_2-A.zip

 Installation_Requirement_2-B.zip

 Stage_2_Wiring.zip

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

 

AS3000-2007Overview.zip

AS3000_AS3008TablesExtract.zip

WiringRules.zip

Part (1) Study the following notes

Installation_Requirement_1-A.zip  Installation_Requirement_1-B.zip

Installation_Requirement_2-A.zip  Installation_Requirement_2-B.zip

Stage_2_Wiring.zip

Cable_Installation.zip

Regulatory_Requirement.zip

BACK UP FOR 9 & 10

Stage 2 Part 1B.zip http://www.filefactory.com/file/c0ccac0/n/Stage_2_Part_1B.zip

 

Stage 2 Part 3.zip  http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip

 

Stage 2 Part 6.zip  http://www.filefactory.com/file/c0cccc0/n/Stage_2_Part_6.zip

 

Stage 3 Part 3.zip  http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip

 

Stage 3 Part 4.zip  http://www.filefactory.com/file/c0ccd9a/n/Stage_3_Part_4.zip

 

Stage 3 Part 5.ziphttp://www.filefactory.com/file/c0ccefd/n/Stage_3_Part_5.zip

 

Stage 3 Part 8.zip  http://www.filefactory.com/file/c0ccf09/n/Stage_3_Part_8.zip

 

Stage 3 Part 9.zip  http://www.filefactory.com/file/c0ccf48/n/Stage_3_Part_9.zip

 

Stage 4 Part 7.ziphttp://www.filefactory.com/file/c0cc479/n/Stage_4_Part_7.zip

 

Stage 4 Part 8.zip  http://www.filefactory.com/file/c0cc5a1/n/Stage_4_Part_8.zip

 

Stage 4 Part 9.zip  http://www.filefactory.com/file/c0cc5db/n/Stage_4_Part_9.zip

 

Stage 4 Part 10.zip http://www.filefactory.com/file/c0cc5f8/n/Stage_4_Part_10.zip

 

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

 

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

G103+104 Notes+Lessons

http://www.filefactory.com/file/2bg8qift6nzh/n/G103_G104_zip

 

Wiring_Notes_1.    Wiring_Notes_2    Switchboard_Wiring

1Wiring_E033_E008    2Wiring_E033_E008

Fixing Equipments

E002_E005.zip Lighting.zip

E_trade_1.zip     E_trade_2.zip     E_trade_3.zip      E_trade_4.zip

G008_General_Notes_1.zip        G008_General_Notes_2.zip

 Hazard_Identification.zip

G003_G004_Wiring_2_Part_1.zip    G003_G004_Wiring_2_Part_2.zip

 Cable_CktProt_E_Accessories.zip   Cable_Conduit_E_Accessories.zip

 Elect_Installation_Protection_Method_Devices.zip

 Elect_Installation_Requirement_1.zip    Elect_Installation_Requirement_1.zip

Elect_Installation_Requirement_2.zip     ElectricInstallationDesign.zip

ElectSystSafety1.zip      ElectSystSafety2.zip

FireProtHeatingTestingEarthing.zip       GeneralWiring.zip   HazardLightingPanel.zip

PanelRCDWireSpecial_Installation.zip   ProtectionMethods.zip

Electrician Capstone unit.pdf

http://www.filefactory.com/file/c392ae1/n/Electrician_Capstone_unit.pdf

Electrician Capstone Test Old Questions

Electrician Capstone Unit Study Guide.zip

http://www.filefactory.com/file/c4bbf1b/n/Electrician_Capstone_Unit_Study_Guide.zip

ONLINEASSESSMENT (17)

Reflect your experience in the work place , write the technical report of 10 pages  & submit it.

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2HR

10.General Protections

  1. Basic Protection Principles
  2. Instrument Transformers
  3. Co-ordination of Over-current and Earth Protection for Distribution Systems
  4. Pilot-wire Differential Protection Feeder

STUDY MATERIALS  (General Protection Principles)

AE.zip           

 

http://www.filefactory.com/file/c0b7ff7/n/AE.zip

G015_G042_G037_G038_G039_Part_2_Notes

ESI_27.1_Arts_and_Science_of_Protective_Relaying_1.zip   

ESI_27.2_Arts_and_Science_of_Protective_Relaying_2.zip

ESI_27.3_Arts_and_Science_of_Protective_Relaying_3.zip        

ESI_27.4Circuit_Breaker_1.zip    ESI_27.5_Circuit_Breaker_2.zip                   

ESI_27_1_Relay_Principle_1.zip      ESI_27_1_Relay_Principle_2.zip

ESI_27_1_Relay_Principle_3.zip      ESI_27.2_Element_of_Relay_Protection.zip        

ESI_27.3_Relay_operation_characteristics.zip         ESI_27.4_Relay_connection_and_response.zip         

ESI_27.5_Machine_and_busbar_protection_1.zip   ESI_27.5_Machine_and_busbar_protection_2.zip     

ESI_27.5_Machine_and_busbar_protection_3.zip              

ESI_27.6_Feeder_protection.zip        ESI_27.7_CT_and_PT.zip    ESI_27.9_Comparator.zip                                                   

ESI_27.10_Static_relay.zip                  ESI_27.11_Test_and_maintenance.zip

ESI_27.12_Circuit_Breaker_1.zip     ESI_27.12_Circuit_Breaker_2.zip

ESI_27.12_Circuit_Breaker_3.zip    ESI_27.12_Circuit_Breaker_4.zip

ESI_27.8_Line_protection_1.zip      ESI_27.8_Line_protection_2.zip

ESI_27.8_Line_protection_3.zip       ESI_27.5_Machine_and_busbar_protection_2_0.zip

ONLINE MCQ TEST (18)

G015+G046 Test 4

http://www.filefactory.com/file/4obspr3n1fkf/n/G015_G046_Online_Test_4_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/faf4fd339f25425784a5c04d186fe5db#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code -----CCLV2SN

ONLINE MCQ TEST (19)

G015+G046 Test 5

http://www.filefactory.com/file/5t1q4kveec4v/n/G015_G046_Online_Test_5_Question_pdf

http://www.classroomclipboard.com/503511/Home/Test/0fd45546932d49dbb628fee5cbbaed7b#/InitializeTest.xaml

First Name-Enter your full name &  Surname- Enter Myanmar Engineering Society Membership Number

Enter the code -----T6X5982

After you have done the test, the score can be printed out in PDF format The score with at least 50% or more for all tests, it will be record of 2 HR x 0.5 = 1HR

TOTAL PROFESSIONAL DEVELOPMENT PROGRAM (PDP) HOURS = 20 Hours  For Year 1 &   

SCOPE Electrical PE (Building Services)

PART  (2)

YEAR 3 & 4  (Minumum 3 to 4 years is required for a graduate to become a PE)

The practice reports need to write for each topics of the study materials included in Scope Part II.

The reports should include the followings:

·      Professional topics----- You need to select the topic such as building electrical wiring or power distribution etc

·      Fundamental of Engineering- What knowledge you got from the materials in your selected professional topic..

·      Engineering Management--- How will you manage the l project / workforce to implement the engineering tasks by applying those knowledge in actual workplace project or simulated work place and project?.

·      Rules Regulations, Standards & Specifications- You need to refer the relevant engineering rules, regulations, standards and specifications in the tasks expressed in your report.

·      Safety—How will you safeguard public safety in performing the engineering tasks?

·      Ethics--- How will you apply professional code of ethics in performing  the engineering tasks?

The candidate should use the following format in the practice exercise reports for each topics of the Scope II that are simulated practice tasks for preparing the Professional Experience and Competency Report to be submitted to Myanmar Engineers Board for Professional Engineer (PE) Registration.

Section (1) Introduction

Section (2) Work experiences in brief and highlight the major important projects

Section 3 to 10  , the following competency should be addressed

·      Apply engineering knowledge, methods and techniques

·      Use of engineering technology , tools and equipments

·      Safeguard public safety

·      Recognition the impacts of engineering on the environment , economy and society.

·      Manage engineering activities

·      Communicate engineering information.

·      Work collaboratively

·      Main and enhance engineering skills and knowledge.  ( Ref-MEB PEng  Reg)

1.Electrical Power Supply

  1. Generation, Transmission and Distribution
  2. Application of Electricity
  3. Solar Photovoltaic System
  4. Design of Electrical Installation
  5. Load Estimation
  6. Power Factor Correction
  7. Power Quality and Power System Harmonics
  8. Consumer and Substation Switchboards and Switch Gears
  9. Maintenance of Electrical Equipments, Switch Gears and Cables
  10. Design of Energy Efficiency and Sustainability

STUDY MATERIALS  (Electrical Power Supply)

G008_General_Notes_1.zip     G008_General_Notes_2.zip      MachineControlCkt1.zip    MachineControlCkt2.zip

MachineControlCkt3.zip         MachineRepair1.zip         MachineRepair2.zip    MachineRepair3.zip      ProcessControlCkt1.zip         ProcessControlCkt2.zip   ProcessControlCkt3.zip

ESI_8_Insulation_1                ESI_8_Insulation_2         ESI_9.1_Protection_Relay_Construction

ESI_9.2Test_Equipment        ESI_33.1_Power_Quality_Concept     ESI_33.2_Harmonic_in_capacitor

ESI_33.3_Harmoniceffect_on_machines     ESI_3.1_HV_Measurement_Cable_Test.zip

ESI_3.2_Magnetic_measurement.zip           ESI_3.3_Power_measurement.zip

ESI_3.4_RLC_measurement_1.zip     ESI_3.4_RLC_measurement_2.zip     ESI_3.4_RLC_measurement_3.zip

ESI_3.5_Digital_equipments.zip          ESI_3.6_V.A.W_meter.zip         ESI_3.7T_and_M.zip ESI_3.8_Thermography.zip

ESI_4_11_Power_Transformer.zip            ESI_5_Machinery_Installation.zip    ESI_7_Drawing_Switching_Diagram.zip

ESI_7_Electrical_Installation_Design.zip   ESI10.1_HV_equipments.zip

ESI10.2_Substation_equipments.zip            ESI12_14_Harmonic.zip

ESI12_14_Reactor.zip                                ESI12_14_Syn_Motor_Generator.zip

ESI_13_Voltage_regulation_devices.zip

Power system 2-G037+G038+G039.zip  

http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip

ESI12_14_Harmonic                     ESI12_14_Reactor       ESI12_14_Syn_Motor_Generator     

ESI_19.1_Computer_Control     ESI_19.4_Turbine_Control  

ESI_19.2_Generator_Control_Load_Flow      

ESI_19.3_Generator       ESI_22.1_Generator_Study        ESI_22.2_Voltage_surge_control

ESI_24_Modern_Power_System

2.bUnintentional_islanding_in_distribution_grids_with_a_high_penetration_of_inverter-based_DG.mht

2.Un intentional islanding in distribution grids-Part 2   2.c.pdf

2.Un intentional islanding in distribution grids-Part 3 2.d-1.pdf

2.Distribution Network 1   2b_Distribution_Network.pdf

2.Distribution Network 2   2d-2.pdf

2.Distribution Network 3   2d-3.pdf

Solar Inspector Training.zip

ESI_22.2_Voltage_surge_control.zip    

ESI_33.5_Harmonic_in_transformer.zip

ESI_33.6_Power_Quality_Improvement_Capacitor_bank.zip   

ESI_33.7_Power_Quality_Improvement-Filter.zip

ESI_33.8_Power_Quality_Improvement-General.zip                   

ESI_33.9_Power_Quality_Improvement-Power_Conditioner.zip

ESI_25_27_31_32_Part_2_Installation_and_testing_0.zip    

ESI_25_27_31_32_Part_3_Electrical_Drawing.zip

ESI_25_27_31_32_Part_4_Data_Com_and_Wiring.zip

ESI_25_27_31_32_Part_5_Installation_Work_Books.zip

ESI_25_27_31_32_Part_6_Switching_1_2.zip

ESI_25_27_31_32_Part_7_Switching_3_4.zip

ESI_25_27_31_32_Part_8a_Electrical_Installation_Requirement_1.zip

ESI_25_27_31_32_Part_8b_Electrical_Installation_Requirement_2.zip

ESI_13_Voltage_Regulating_Devices.zip

ESI_27.7_CT_and_PT.zip

ESI_27.9_Comparator.zip   ESI_27.10_Static_relay.zip    ESI_27.11_Test_and_maintenance.zip

Advanced Diploma in Electricity Supply Industry (ESI)

The LINK for

Study Package (2)-Power System Planning

Study Package (3)-Testing

The LINK for

Study Package (16+17)-OHS

Study Package (20) Transmission System

Study Package (28) Power Accessories

The LINK for

Study Package (23) Machine Rating

The LINK for

Study Package (5) Machine Installation

Study Package (9) Protection

ESI_9.2Test_Equipment.zip

The LINK for

Study Package (3)-Testing

Study Package (5) Machine Installation

Study Package (15) Electrical Estimating

The LINK for

Study Package (1)-OHS

Study Package (12) Harmonics

Study Package (19) Computer Control

Study Package (20) Transmission System

The LINK for

Study Package (4) Power Transformer

Study Package (7) Drawing

Study Package (21+34)-Electrical Distribution

The LINK for

Study Package (10) HV Equipments

Study Package (18) Sub station equipments

The LINK for

Study Package (12) Harmonics

Study Package (22) Generator

Study Package (24) Signal Communication

The LINK for

Study Package (19) Generator

Study Package (25+27+31+32) Installation & Testing

The LINK for

Study Package (9) Protection

Study Package (16+17)-OHS

The LINK for

Study Package (22) Generator

The LINK for

Study Package (34) Power Equipments Commissioning

Study Package (21+34)-Electrical Distribution

The LINK for

Study Package (26) (41)

The LINK for

Study Package (6+ 10) HV Equipments

The LINK for

Study Package (7) Drawing

Study Package (8) Insulation

Study Package (13) Voltage Regulation

The LINK for

Study Package (15) Electrical Estimating

Study Package (15) Transmission System

Study Package (25+27+31+32) Installation & Testing

The LINK for

Study Package (18) Sub station equipments

Study Package (28) Power Accessories

The LINK for

Study Package (24) Modern Power System

The LINK for

Study Package (33) Power Quality

The LINK for

Study Package (27) Relay

The LINK for

Study Package (13) Voltage Regulation

The LINK for

Study Package (35)

The LINK for

Study Package (34) Equipments Commissioning

The LINK for

Study Package (8) Insulation

Study Package (12) Harmonics

The LINK for

Study Package (25+27+31+32) Installation & Testing

Study Package (25+27+31+32) Installation & Testing

The LINK for

Study Package (27) Relay

The LINK for

Study Package (20) Transmission System

EXERCISE ASSESSMENT (20)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in electrical power supply in above mentioned format & submit it to the assessor.                                                                                             ( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

2.Lighting Requirement for Workplace , Indoor and Outdoor

  1. Visual Needs for Safety and Security
  2. Determine the Lighting Requirement for Indoor and Outdoor Workplaces

STUDY MATERIALS  (Lighting Requirement )

Lighting.zip           E_trade_1.zip             E_trade_2.zip           E_trade_3.zip             E_trade_4.zip

G008_General_Notes_1.zip                  G008_General_Notes_2.zip                   Hazard_Identification.zip

K041 Lesson 16-Energy efficiency+Lighting.zip

 

http://www.filefactory.com/file/c0b6e0f/n/K041_Lesson_16-Energy_efficiency_Lighting.zip

 

K041 Lesson 17-Illumination+Smoke alarm.zip

 

http://www.filefactory.com/file/c0b6fc5/n/K041_Lesson_17-Illumination_Smoke_alarm.zip

EXERCISE ASSESSMENT (21)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in workplace lighting in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

3.Energy Efficiency Requirement

  1. Minimum Energy Efficiency Requirements for New Installation and Replacement of Systems and Equipments in Buildings
  2. Replacement of Components of Systems and Equipments in Buildings
  3. Criteria for Determining Compliance with Energy Efficiency in Building with regards to Air conditioning and Heat Rejection Equipments, Water Heater, Motor Drives and Lighting used in Buildings.

STUDY MATERIALS  (Energy Efficiency)

Building Design+Material Science-K041+E047.zip

 

http://www.filefactory.com/file/c0b645d/n/Building_Design_Material_Science-K041_E047.zip

 

K041_Building_Design_1   

K041_Building_Design_2   

K041Airconditioning   

K041Energy_Management_Textbook    

E047Mech

UEENEEK041B_E047B_Tutorials   

Energy_survey_assignment

K041Textbook1.zip      K041Textbook2.zip        K041Textbook3.zip

EXERCISE ASSESSMENT (22)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in energy efficiency in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

4.Protection for Safety

  1. Principle of Operation of Protective Devices
  2. Maximum Demand and Diversity Factors
  3. Protection against Over Current and Short Circuit Currents
  4. Protective Devices and Circuit Conductors
  5. Discrimination in Protection of Electrical Circuits

 

STUDY MATERIALS  (Protection for Safety)

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

G033

http://www.filefactory.com/file/1b2utxydvcx7/n/G033_zip

 

Wiring_Notes_1.

Wiring_Notes_2 Switchboard_Wiring

1Wiring_E033_E008 2Wiring_E033_E008

Fixing Equipments

E002_E005.zip Lighting.zip

E_trade_1.zip

E_trade_2.zip

 E_trade_3.zip

E_trade_4.zip

G008_General_Notes_1.zip

G008_General_Notes_2.zip

 Hazard_Identification.zip

 G003_G004_Wiring_2_Part_1.zip

G003_G004_Wiring_2_Part_2.zip

 Cable_CktProt_E_Accessories.zip

 Cable_Conduit_E_Accessories.zip

 Elect_Installation_Protection_Method_Devices.zip

 Elect_Installation_Requirement_1.zip

 Elect_Installation_Requirement_1.zip

 Elect_Installation_Requirement_2.zip

ElectricInstallationDesign.zip

ElectSystSafety1.zip

 ElectSystSafety2.zip

FireProtHeatingTestingEarthing.zip

GeneralWiring.zip

HazardLightingPanel.zip

PanelRCDWireSpecial_Installation.zip

ProtectionMethods.zip

G008_General_Notes_1.zip     G008_General_Notes_2.zip      MachineControlCkt1.zip    MachineControlCkt2.zip

MachineControlCkt3.zip         MachineRepair1.zip         MachineRepair2.zip    MachineRepair3.zip      ProcessControlCkt1.zip         ProcessControlCkt2.zip   ProcessControlCkt3.zip

ESI_8_Insulation_1                ESI_8_Insulation_2         ESI_9.1_Protection_Relay_Construction

ESI_9.2Test_Equipment        ESI_33.1_Power_Quality_Concept     ESI_33.2_Harmonic_in_capacitor

ESI_33.3_Harmoniceffect_on_machines     ESI_3.1_HV_Measurement_Cable_Test.zip

ESI_3.2_Magnetic_measurement.zip           ESI_3.3_Power_measurement.zip

ESI_3.4_RLC_measurement_1.zip              ESI_3.4_RLC_measurement_2.zip

ESI_3.4_RLC_measurement_3.zip

ESI_3.5_Digital_equipments.zip          ESI_3.6_V.A.W_meter.zip         ESI_3.7T_and_M.zip

ESI_3.8_Thermography.zip

ESI_4_11_Power_Transformer.zip             ESI_5_Machinery_Installation.zip    

ESI_7_Drawing_Switching_Diagram.zip     ESI_7_Electrical_Installation_Design.zip

ESI10.1_HV_equipments.zip                      ESI10.2_Substation_equipments.zip

ESI12_14_Harmonic.zip                             ESI12_14_Reactor.zip

ESI12_14_Syn_Motor_Generator.zip           ESI_13_Voltage_regulation_devices.zip

BACK UP FOR 4

Stage 3 Part 3.zip  http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip

 

Stage 4 Part 15.zip  http://www.filefactory.com/file/c0cc7cb/n/Stage_4_Part_15.zip

Stage 4 Part 17.zip http://www.filefactory.com/file/c0cc76b/n/Stage_4_Part_17.zip

 

Stage 4 Part 7.zip  http://www.filefactory.com/file/c0cc479/n/Stage_4_Part_7.zip

 

Stage 4 Part 14.zip  http://www.filefactory.com/file/c0cc684/n/Stage_4_Part_14.zip

Study Package (19) Generator

ESI_19.4_Generator_.zip

Study Package (28) Power Accessories

ESI_28.1_Power_Accessories_1.zip   ESI_28.2_Power_Accessories_2.zip

ESI_28.3_Power_Accessories_3.zip   ESI_28.4_Power_Accessories_4.zip

ESI_28.5_Power_Accessories_5.zip   ESI_28.6_Power_Accessories_6.zip

Study Package (34) Equipments Commissioning

ESI_34.1_Background_theory_for_equipments_commissioning_1.zip

ESI_34.2_Background_theory_for_equipments_commissioning_2.zip

ESI_34.3_Background_theory_for_equipments_commissioning_3.zip

ESI_34.4_Background_theory_for_equipments_commissioning_4.zip

ESI_34.5_Background_theory_for_equipments_commissioning_5.zip

ESI_34.6_Background_theory_for_equipments_commissioning_6.zip

Study Package (27) Relay

ESI_27_1_Relay_Principle_1.zip        ESI_27_1_Relay_Principle_2.zip

ESI_27_1_Relay_Principle_3.zip

ESI_27.2_Element_of_Relay_Protection.zip

ESI_27.3_Relay_operation_characteristics.zip        ESI_27.4_Relay_connection_and_response.zip

ESI_27.5_Machine_and_busbar_protection_1.zip  ESI_27.5_Machine_and_busbar_protection_2.zip

ESI_27.5_Machine_and_busbar_protection_3.zip

ESI_27.6_Feeder_protection.zip      ESI_27.7_CT_and_PT.zip      ESI_27.9_Comparator.zip

ESI_27.10_Static_relay.zip               ESI_27.11_Test_and_maintenance.zip

ESI_27.12_Circuit_Breaker_1.zip    ESI_27.12_Circuit_Breaker_2.zip

ESI_27.12_Circuit_Breaker_3.zip    ESI_27.12_Circuit_Breaker_4.zip

ESI_27.8_Line_protection_1.zip      ESI_27.8_Line_protection_2.zip

ESI_27.8_Line_protection_3.zip      ESI_27.5_Machine_and_busbar_protection_2_0.zip

 

EXERCISE ASSESSMENT (23)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in protection and safety in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

5.Cables,Bus-ways and Distribution Boards

  1. Types and Characteristics of Cables
  2. Method Installation
  3. Sizing of Conduit and Trunking
  4. Factors Affecting the Current Carrying Capacities of Cables
  5. Sizing of Cables and Bus-ways for use Under Different Types of Conditions
  6. Connected Load, Maximum Demand and Circuit Breakers Ratings for an Electrical Distribution Board

STUDY MATERIALS  (Electrical Installation)

http://www.filefactory.com/file/c0b67b7/n/Electrical_Workshop_Wiring_E001_2_3_4_5_7_8_33_G003_4_7.zip

 

AS3000-2007Overview.zip     AS3000_AS3008TablesExtract.zip    WiringRules.zip

Part (1) Study the following notes

 Installation_Requirement_1-A.zip   Installation_Requirement_1-B.zip

 Installation_Requirement_2-A.zip    Installation_Requirement_2-B.zip

 Stage_2_Wiring.zip

G003_G004_Wiring_2_Part_1.zip

G003_G004_Wiring_2_Part_2.zip

Cable_CktProt_E_Accessories.zip

Cable_Conduit_E_Accessories.zip

Elect_Installation_Protection_Method_Devices.zip

Elect_Installation_Requirement_1.zip

Elect_Installation_Requirement_1.zip

Elect_Installation_Requirement_2.zip

ElectricInstallationDesign.zip

ElectSystSafety1.zip

ElectSystSafety2.zip

FireProtHeatingTestingEarthing.zip

GeneralWiring.zip

HazardLightingPanel.zip

PanelRCDWireSpecial_Installation.zip

ProtectionMethods.zip

Assessment

Read the above notes files and do the assignments for the following tutorial file.

WiringPracticals.zip

G003G004Tutorial.zip

PRACTICAL

Workshop 2+3

WorkShop_Part_2_Practical_1_to_6_.zip        WorkShop_Part_2_Practical_7_to_12_.zip

WorkShop_Part_2_Practical_13_to_17_.zip     WorkShop_Part_2_Practical_18_to_21_.zip

ElectricalWorkshopPart3_G008_Group1Machine_.zip

ElectricalWorkshopPart3_G008_Group2LineProtection_.zip

ElectricalWorkshopPart3_G008_Group3InstrumentsDevices_.zip

OTHER PRACTICALS

ELECTRICAL_WORKSHOP_PART_2_G003_G004_G009_.zip

Electrical_Workshop_Part_2_Practical_1_to_18.zip  

Electrical_Workshop_Part_2_Practical_19_to_21.zip

G003_G004_G009Practicals.pdf

G005

UEENEEG005B

Verify compliance and functionality of general electrical installations

G005.zip

Power Distribution Trade

Power_Distribution_Trade.zip

Metering

Metering.zip

Switch Gear

Elect_Installation_Protection_Method_Devices.zip

ElectSystSafety1.zip                ElectSystSafety2.zip

7762AH Power System Fundamental

AH_Day_1.zip   AH_Day_2_3.zip   AH_Day_4.zip   AH_Day_5.zip   AH_Day_6_7_8.zip

ESI_27.4Circuit_Breaker_1.zip     ESI_27.5_Circuit_Breaker_2.zip

ESI_7_Switching_system_design_consideration.zip    ESI_8.2_Site_Insulation_Surge_Protection.zip

EXERCISE ASSESSMENT (24)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in electrical installation in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

 

 

 

6.Earthing

  1. Purpose of Earthing
  2. Methods of Earthing
  3. Earth Fault Loop Impedance and Earth Fault Current
  4. Suitable Sizes of Circuit Protective Conductor
  5. Testing of Earthing

STUDY MATERIALS  (Electrical Earthing)

G007

G007 Lesson 1 AS3000 Wiring rule overview.zip

http://www.filefactory.com/file/cf94220/n/G007_Lesson_1_AS3000_Wiring_rule_overview.zip

G007 Lesson 2 Maximum Demand calculation.zip

http://www.filefactory.com/file/cf9456f/n/G007_Lesson_2_Maximum_Demand_calculation.zip

G007 Lesson 3 Cable selection.zip

http://www.filefactory.com/file/cf9465c/n/G007_Lesson_3_Cable_selection.zip

G007 Lesson 4 Cable voltage drop calculation.zip

http://www.filefactory.com/file/cf9479e/n/G007_Lesson_4_Cable_voltage_drop_calculation.zip

G007 Lesson 5 Derating of cable part 1.zip

http://www.filefactory.com/file/cf95acb/n/G007_Lesson_5_Derating_of_cable_part_1.zip

G007 Lesson 6 Derating of cable part 2.zip

http://www.filefactory.com/file/cf95a6b/n/G007_Lesson_6_Derating_of_cable_part_2.zip

G007 Lesson 7 Derating of cable for HRC fuse protection.zip

http://www.filefactory.com/file/cf95cd7/n/G007_Lesson_7_Derating_of_cable_for_HRC_fuse_protection.zip

G007 Lesson 8 Final subcircuit fault loop impedance.zip

http://www.filefactory.com/file/cf95dd1/n/G007_Lesson_8_Final_subcircuit_fault_loop_impedance.zip

Electrical Installation requirement

FireProtHeatingTestingEarthing.zip

HazardLightingPanel.zip

PanelRCDWireSpecial_Installation.zip

ProtectionMethods.zip

ESI_8.2_Site_Insulation_Surge_Protection.zip  

Power system 2-G037+G038+G039.zip

http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip

G037+G038+G039 Lesson 2-Site Earthing.zip

 

http://www.filefactory.com/file/c0bb244/n/G037_G038_G039_Lesson_2-Site_Earthing.zip

G037+G038+G039 Lesson 8-Turbine Control+Power Line Earthing.zip

http://www.filefactory.com/file/c0bb521/n/G037_G038_G039_Lesson_8-Turbine_Control_Power_Line_Earthing.zip

G037+G038+G039 Lesson 9-Insulator.zip

http://www.filefactory.com/file/c221eff/n/G037_G038_G039_Lesson_9-Insulator.zip

Power System (2)

G037+G038+G039 Lesson 1-Power Flow.zip

http://www.filefactory.com/file/c0bb2a3/n/G037_G038_G039_Lesson_1-Power_Flow.zip

G037+G038+G039 Lesson 2-Site Earthing.zip

 

http://www.filefactory.com/file/c0bb244/n/G037_G038_G039_Lesson_2-Site_Earthing.zip

G037+G038+G039 Lesson 4-Auxiliary System+Harmonic.zip

 

http://www.filefactory.com/file/c0bb3c3/n/G037_G038_G039_Lesson_4-Auxiliary_System_Harmonic.zip

G037+G038+G039 Lesson 3-Power System Control Equipments.zip

 

http://www.filefactory.com/file/c0bced7/n/G037_G038_G039_Lesson_3-Power_System_Control_Equipments.zip

G037+G038+G039 Lesson 5-Harmonic.zip

 

http://www.filefactory.com/file/c0bb35b/n/G037_G038_G039_Lesson_5-Harmonic.zip

G037+G038+G039 Lesson 6-Harmonic Calculation.zip

http://www.filefactory.com/file/c0bb43f/n/G037_G038_G039_Lesson_6-Harmonic_Calculation.zip

G037+G038+G039 Lesson 7-Synchronous Generator Loading.zip

http://www.filefactory.com/file/c0bb49d/n/G037_G038_G039_Lesson_7-Synchronous_Generator_Loading.zip

G037+G038+G039 Lesson 8-Turbine Control+Power Line Earthing.zip

http://www.filefactory.com/file/c0bb521/n/G037_G038_G039_Lesson_8-Turbine_Control_Power_Line_Earthing.zip

G037+G038+G039 Lesson 9-Insulator.zip

http://www.filefactory.com/file/c221eff/n/G037_G038_G039_Lesson_9-Insulator.zip

G037+G038+G039 Lesson 10-Reliability of Power System.zip

http://www.filefactory.com/file/c0bb6e4/n/G037_G038_G039_Lesson_10-Reliability_of_Power_System.zip

G037+G038+G039 Lesson 11-Harmonic Reduction.zip

 

http://www.filefactory.com/file/c0bce89/n/G037_G038_G039_Lesson_11-Harmonic_Reduction.zip

G037+G038+G039 Lesson 12-Grounding + Power Quality.zip

http://www.filefactory.com/file/c0bb872/n/G037_G038_G039_Lesson_12-Grounding_Power_Quality.zip

 G037+G038+G039 Lesson 13-Power Quality.zip

http://www.filefactory.com/file/c0bb98d/n/G037_G038_G039_Lesson_13-Power_Quality.zip

G037+G038+G039 Lesson 14-Harmonic Model.zip

http://www.filefactory.com/file/c0bcad7/n/G037_G038_G039_Lesson_14-Harmonic_Model.zip

 G037+G038+G039 Lesson 15-Harmonic Losses in Transformer.zip

http://www.filefactory.com/file/c0bca73/n/G037_G038_G039_Lesson_15-Harmonic_Losses_in_Transformer.zip

G037+G038+G039 Lesson 16-Reliability Improvement.zip

http://www.filefactory.com/file/c0bcba0/n/G037_G038_G039_Lesson_16-Reliability_Improvement.zip

G037+G038+G039 Lesson 17-Preparation for emergency.zip

http://www.filefactory.com/file/c0bcbd7/n/G037_G038_G039_Lesson_17-Preparation_for_emergency.zip

G037+G038+G039 Lesson 18-Harmonic problems.zip

http://www.filefactory.com/file/c0bcb68/n/G037_G038_G039_Lesson_18-Harmonic_problems.zip

G037+G038+G039 Lesson 19-Synchronous machine problems.zip

http://www.filefactory.com/file/c0bccb8/n/G037_G038_G039_Lesson_19-Synchronous_machine_problems.zip

 G037+G038+G039 Lesson 20-Power Generation + Generator Control.zip

http://www.filefactory.com/file/c0bcc20/n/G037_G038_G039_Lesson_20Power_Generation_Generator_Control.zip

G037+G038+G039 Lesson 21-Turbine Control+ Digital Excitation.zip

http://www.filefactory.com/file/c0bcdf6/n/G037_G038_G039_Lesson_21-Turbine_Control_Digital_Excitation.zip

G037+G038+G039 Lesson 22-Power System Protection.zip

http://www.filefactory.com/file/c0bcd4c/n/G037_G038_G039_Lesson_22-Power_System_Protection.zip

G037+G038+G039 Lesson 23-Switch Gear.zip

http://www.filefactory.com/file/c0bcea8/n/G037_G038_G039_Lesson_23-Switch_Gear.zip

EXERCISE ASSESSMENT (25)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in site earthing in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

7.Emergency Lighting

  1. Exit and Emergency Lighting Requirements for Evaluation of Occupants
  2. Types of Back-up Power Supply
  3. Exit and Directional Signs

STUDY MATERIALS  (Emergency Lighting)

EE 617 Building Electrical and Mechanical System Part 1 ( 1 pt)

EE 617 Building Electrical and Mechanical System Part 2

BAE 606 Building Service Electrical & Mechanical Engineering

Lighting.zip

E_trade_1.zip        E_trade_2.zip           E_trade_3.zip             E_trade_4.zip

EXERCISE ASSESSMENT (26)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in emergency lighting in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

8.Standby Power Generator System

  1. Types of Essential and Critical Loads
  2. Sizing of Generator
  3. Voltage Regulation and its Effects on Generator Sizing
  4. Protection of Alternators and Prime Movers
  5. Installation of Standby Generator System Including Day-tank Battery and Charger, Fuel Supply, Engine cooling system, Plant room ventilation and fresh air intake, contend instrumentation plant and automatic transfer switch.

STUDY MATERIALS  (Standby Power GeneratorSystem)

Study Package (22) Generator

ESI_22.1_Generator_Study.zip

ESI_22.2_Voltage_surge_control.zip

Study Package (23) Machine Rating

ESI_23.1_Generator_Rating.zip

ESI_23.1_Transformer_Rating.zip

Study Package (24) Modern Power System

ESI_24_Modern_Power_System.zip

EE 512 Electrical Power Generation System ( 1 pt)

EE 512 Principles of Power Systems

EE 512 Generation Transmission and Distribution of Electrical Power

EXERCISE ASSESSMENT (27)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in stand by power system in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

 

 

 

 

9.Automatic Fire Alarm System

  1. Requirement for automatic and manual fire detection system and purpose of compartmentation as required by the fire code.
  2. Interaction with other building services as emergency voice communication system, lifts, AHU, pressurization fans and auto-doors during alarm activation.

STUDY MATERIALS  (Automatic Fire Alarm System)

Part 1 Over all Knowledge of the subject

BAE 606 Building Service Electrical & Mechanical Engineering

Part 2 Competency units of the subject

Building Electrical & Mechanical System

EE 617 Building Electrical and Mechanical System Part 1 ( 1 pt)

EE 617 Building Electrical and Mechanical System Part 2

HazardLightingPanel.zip

ADDITIONAL STUDY FOR AUTOMATIC FIRE ALARM SYSTEM

Contact:  highlightcomputergroup1@gmail.com to request the URL for download

10.Emergency Voice Communication System

  1. Requirement for public address system for building above 24 meters but less than 60 meters.
  2. Requirements for emergency voice communication for building above 60 meters.
  3. Requirement for fireman intercom.

STUDY MATERIALS  (Emergency Voice Communication System)

Study Package (24) Signal Communication

ESI_26_Electronics_Signals.zip

FireProtHeatingTestingEarthing.zip

E071Hazard_Identification_Wk6_.zip

EXERCISE ASSESSMENT (28)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in emergency voice communication system in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

ADDITIONAL STUDY FOR  EMERGENCY VOICE COMMUNICATION

Contact:  highlightcomputergroup1@gmail.com to request the URL for download

11.Inspection, Testing and Common Violation in Electrical Installation

  1. Mandatory requirements for inspection and testing of electrical prior to energisation of electrical supply
  2. Types of test instruments and standard methods of testing.

STUDY MATERIALS  (Electrical Testing & Inspection)

Electrical Risk Assessment

Project Risk Management References

Electrician Capstone unit.pdf

http://www.filefactory.com/file/c392ae1/n/Electrician_Capstone_unit.pdf

Electrician Capstone Test Old Questions

Electrician Capstone Unit Study Guide.zip

http://www.filefactory.com/file/c4bbf1b/n/Electrician_Capstone_Unit_Study_Guide.zip

SubstationEntry.zip

Construction ElectricalSafety.zip

InserviceTesting.zip

UEENEEE033

Electrical_safe_working.zip

NREL_Disconnect_Reconnect.zip

AS3000-2007Overview.zip

AS3000_AS3008TablesExtract.zip

WiringRules.zip

Part (1) Study the following notes

Installation_Requirement_1-A.zip

Installation_Requirement_1-B.zip

Installation_Requirement_2-A.zip

Installation_Requirement_2-B.zip

Stage_2_Wiring.zip

Cable_Installation.zip

Protection_1.zip                   Protection_2.zip

System_safety_1.zip           System_safety_2.zip

Regulatory_Requirement.zip

FireProtHeatingTestingEarthing.zip

EXERCISE ASSESSMENT (29)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in electrical safety inspection and testing in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

 

12.Measuring Instruments

  1. Principle of operation of Electrical Measuring Instruments
  2. Essential of Indicating Instruments
  3. Types of Instruments
  4. Errors Common to All Types of Instruments
  5. Moving Iron Instruments
  6. Moving coil Instruments
  7. Comparison Between Moving Iron and Moving Coil Instruments
  8. Comparison Between Moving Iron and Dynometer Type Instrument
  9. Extension of Instrument Range
  10. Measurement of Power
  11. Watt Meter, Dynometer Type Wattmeter
  12. Energy Meter, Multi-meter or AVO Meter, Electronic Multi-meter
  13. Digital Multi-meter

 

 

STUDY MATERIALS  (Electrical Measurement)

EE 404 Electrical Measurement ( 1 pt)

EXERCISE ASSESSMENT (30)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in electrical measurement and testing in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)

13.Electrical Engineering Codes/ Standards

  1. Codes, Standards and Regulations
  2. Codes and Standards for building services

STUDY MATERIALS  (Electrical Engineering Code and Standard)

MYANMAR

Myanmar Electrical Regulations

UK

IEE2002

Electrical Building Services IEE based

Domestic Electric Wiring BS7671_2008

Handbook of Electrical Installation Practice UK

USA

IEEE colored books

Handbook of Electrical Design Details

American Electrician Handbook

 

IEC

Electrical Engineer Portable Handbook (IEC)

AUSTRALIA & NEW ZEALAND

Australian Electrical Wiring Rules Part 1

Australian Electrical Wiring Rules Part 2

Australian Electrical Wiring Rules Part 3

New South Wales Electrical Service Rules Australia

OTHERS

Switch Gear Manual

Energy Management Handbook

 

Handbook of Electrical Design Details

Newnes Electrical Power Engineer Handbook

Newnes_Electrical_Engineers_Handbook

Power Fault Calculation & Protection Cable Selection_Note

Power Data Planning India

Switch Gear Online

 

 

Engineering Competency Report Submitted by U Kyaw Naing for Registered Professional Engineer of Queensland

REFERENCES

Service_Rule_1    Service_Rule_2     Service_Rule_3

AS3000 Wiring Rules Overview

AS3000-2007Overview.zip

AS3000_AS3008TablesExtract.zip  

WiringRules.zip

E071DesiE071HVOverheadConductors_Wk2-3_.zip

E071LVOverheadConductor_Wk4-5_.zip  

E071Hazard_Identification_Wk6_.zip

E071General_Wiring_Wk7-8_.zip

E071UGCableSpecification_Wk9-10-11_.zip

E071TelecomDatacom_Wk12_.zip

E071Switching_Wk13_.zip

E071DesignStdOHDevelopment_Wk14-16_.zip

12-Specifications

13-BSpecifications

14-Specifications 

E071DesiE071HVOverheadConductors_Wk2-3_.zip 

6-ElectricalDrawing

BACK UP FOR 2, 6  & 10

Stage 4 Part 7.zip   http://www.filefactory.com/file/c0cc479/n/Stage_4_Part_7.zip

 

Stage 4 Part 11.zip  http://www.filefactory.com/file/c0cc540/n/Stage_4_Part_11.zip

 

Stage 4 Part 12.zip  http://www.filefactory.com/file/c0cc566/n/Stage_4_Part_12.zip

Stage 4 Part 13.zip  http://www.filefactory.com/file/c0cc6c1/n/Stage_4_Part_13.zip

 

Electrician Capstone unit.pdf

http://www.filefactory.com/file/c392ae1/n/Electrician_Capstone_unit.pdf

Electrician Capstone Test Old Questions

   Electrician Capstone Unit Study Guide.zip

http://www.filefactory.com/file/c4bbf1b/n/Electrician_Capstone_Unit_Study_Guide.zip

 

OTHERS REFERENCES

E_trade_1.zip      E_trade_2.zip      E_trade_3.zip      E_trade_4.zip

G008_General_Notes_1.zip           G008_General_Notes_2.zip

Part (1) Study the following notes

Installation_Requirement_1-A.zip    Installation_Requirement_1-B.zip

Installation_Requirement_2-A.zip    Installation_Requirement_2-B.zip

Stage_2_Wiring.zip

Do the assignments from the following book & submit the assignment (1)

Cable_Installation.zip

Assignment: At the end of each chapter, there are review questions & exercises. You need to do all exercises & submit them as assignment

 Part (2) Study the following notes

Protection_1.zip       Protection_2.zip     System_safety_1.zip    System_safety_2.zip

Do the assignments from the following book & submit the assignment (2)

Regulatory_Requirement.zip

Assignment: At the end of each chapter, there are review questions & exercises. You need to do all exercises & submit them as assignment

Tutorial review questions and answers

Electrical_trade_review_questions_and_answers.zip

Stage 2 Part 6.zip

http://www.filefactory.com/file/c0cccc0/n/Stage_2_Part_6.zip

Stage_1_Wiring_Practical

Stage_2_Wiring

System_Installation_Examples_-_NUER02_version

System_safety_1

System_safety_2

 Stage_1_Wiring_Practical.zip

Electrical_safe_working.zip

 OTHER REFERENCES

UEENEEG003B     

 

Install wiring and accessories for low voltage circuits

 UEENEEG004B     

 

Install low voltage electrical apparatus and associated equipment

G003_G004_Wiring_2_Part_1.zip

G003_G004_Wiring_2_Part_2.zip

Stage 3 Part 1B.zip

http://www.filefactory.com/file/c0ccc42/n/Stage_3_Part_1B.zip

Cable_CktProt_E_Accessories

Cable_Conduit_E_Accessories

Stage 4 Part 8.zip

http://www.filefactory.com/file/c0cc5a1/n/Stage_4_Part_8.zip

Cable+CktProt+E Accessories

Cable+Conduit+E Accessories

Elect Installation Protection Method Devices

Stage 4 Part 9.zip

http://www.filefactory.com/file/c0cc5db/n/Stage_4_Part_9.zip

 G003+G004 Notes Upload

Cable_CktProt_E_Accessories.zip

Cable_Conduit_E_Accessories.zip

Elect_Installation_Protection_Method_Devices.zip

Elect_Installation_Requirement_1.zip

Elect_Installation_Requirement_1.zip

Elect_Installation_Requirement_2.zip

ElectricInstallationDesign.zip

Stage 3 Part 5.zip

http://www.filefactory.com/file/c0ccefd/n/Stage_3_Part_5.zip

ElectSystSafety1

ElectSystSafety2

Energy survey assignment

FireProtHeatingTestingEarthing

G003_G004_G009Practicals

G003_G004_Wiring_2_Part_1

G003_G004_Wiring_2_Part_2

G003G004Tutorial

G005

 

ElectSystSafety1.zip

ElectSystSafety2.zip

FireProtHeatingTestingEarthing.zip

GeneralWiring.zip

HazardLightingPanel.zip

PanelRCDWireSpecial_Installation.zip

ProtectionMethods.zip

Assessment

Read the above notes files and do the assignments for the following tutorial file.

Stage 3 Part 9.zip

http://www.filefactory.com/file/c0ccf48/n/Stage_3_Part_9.zip

WiringPracticals

WorkShop_Part_2_Practical_1_to_6_

WorkShop_Part_2_Practical_7_to_12_

WorkShop_Part_2_Practical_13_to_17_

WorkShop_Part_2_Practical_18_to_21_

 

 

 EXERCISE ASSESSMENT (31)

Based on the study you got from the above resources, write a professional experiences and competency report for engineering tasks in electrical engineering codes and standards used in engineering work in above mentioned format & submit it to the assessor.

( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)