SELF
STUDY PROFESSIONAL DEVELOPMENT ONLINE LEARNING RESOURCES MATERIALS AND SELF
ASSESSMENT ONLINE TESTS FOR ASSISTING THE CANDIDATES TO PREPARE FOR PROFESSIONAL
ENGINEER (ELECTRICAL-BUILDING SERVICES) REGISTRATION WITH MYANMAR BOARD OF
ENGINEERS
Prepared
BY- U Kyaw
Naing
Registered Professional Engineer of Queensland
RPEQ-Electrical (Registration Number 07661)
Board of Professional Engineers of Queensland State
Government (Australia)
www.bpeq.qld.gov.au
&
Electrical Engineering Teacher (TAFE-NSW)
(Australia)
Based
on 25 years experiences since BE (Electrical Power) Graduation from Yangon
Institute of Technology in 1987 as electrical engineer, electrician and
electrical engineering teacher in Myanmar, Fiji, Australia, New Zealand &
Niue, these online electrical learning materials in line with the study
materials being used to teach the engineering courses in Australia are prepared
to assist Young Myanmar Engineers to participate in professional development
programs of Myanmar Engineering Society
to accomplish the aims & objectives of Myanmar Engineers Board in the
process of Professional Engineers Registration in Myanmar.
Online
tests and assessments are also included for the candidates to assess their self
learning. The resources are not only theoretical studies but also industrial
rules and regulations in Singapore, UK , Australia and New Zealand and practical
resources of engineering practice. PEng registration competency report
writing in Australia & New Zealand are also included in the resources.
Engineering Report Writing.zip
&
(Engineering
Competency Report Submitted by U Kyaw Naing for Registered Professional
Engineer of Queensland, Australia). Browse
http://www.electricaldiploma2013.zoomshare.com/
for details of Australian Electrical Training.
Members
of Myanmar Engineering Society at the grade of Junior Member can utilize the
materials uploaded to this site at free
of charge
for online self learning & self assessment. The candidates should have good
internet access to download the study support materials from this site. But for sending the materials in USB or
copying them from the authorised representatives in Myanmar or assessing and
providing individual professional support by e-mail, appropriate fees can be
chargeable.
Further
contact should be made to: U Kyaw Naing at highlightcomputergroup1@
gmail.com
SCOPE-
Electrical PE (Building Services)
PART (1)
YEAR
1 & 2 (Minumum
3 to 4 years is required for a graduate to become a
PE)
(
Total PDP Points for Informal Learning Activities-Private Study Part Time) (
Total 10 points per year maximum)(MEB-PE Regulation Appendix 3). Ctrl+Click the
link & then allow to download the contents.
The
self study learning resources materials for SCOPE – Electrical PE (Building
Services)
The
tests are based on your general knowledge on the subject. They are not designed
to test the limited area of study that the candidate learns one paper & sits
one test.
1.Basic
Electricity
STUDY
MATERIALS (DC
Circuits)
http://www.filefactory.com/file/c0cb8ab/n/Stage_1_Part_1.zip
ONLINE
MCQ TEST (1)
http://www.filefactory.com/file/58r3nfe1qieh/n/E003_E004_Online_Test_1_Question_pdf
First
Name-Enter your full name & Surname- Enter Myanmar Engineering
Society Membership Number
Enter
the code--- G4UYTV
STUDY
MATERIALS (AC Circuit 1)
ONLINE
MCQ TEST (2)
http://www.filefactory.com/file/7ebmnciqxmf3/n/G002_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- 8YGTHT
STUDY
MATERIALS (AC Circuit 2)
G048_7769AC
G048_Tutorials.zip
Notes
for assignment/ tutorials
G048_Full_Part_1.zip G048Part2.zip
E025_Circuits_1 E025_Circuits_2
Stage 2 Part 3.zip http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip
Stage 3 Part 2.zip http://www.filefactory.com/file/c0ccdbc/n/Stage_3_Part_2.zip
ONLINE
MCQ TEST (3)
http://www.filefactory.com/file/52h82a0t0f3f/n/E025_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- DCVK7
ONLINE
MCQ TEST (4)
http://www.filefactory.com/file/713uvwk5vbel/n/G048_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- G9PLM
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2
HR
2. Three phase Circuits and System
STUDY
MATERIALS (Three Phase Circuits)
G049_7762AB_7761M_Notes
G049_7762ABTutorial
E029_Motor_Control_1
E029_Motor_Control_2
Fault
Calculation
AB-Part1.zip AB-Part_2.zip
AB-Part_3.zip
AB-Part4.zip
AB-Part5.zip
AB-Part6.zip
Power
System Analysis
7761M-Part1.zip
7761MPart-2.zip
7761M-Part-3.zip 7761M-Part-4.zip
7761M-Part-5.zip
7761M-Part-6.zip
7761M-Part-7.zip
Stage 2 Part 3.zip http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip
ONLINE
MCQ TEST (5)
G049
Test 1
http://www.filefactory.com/file/5vhbs8sn20f3/n/G049_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- UE6FAG
G049
Test 2
http://www.filefactory.com/file/611ftvpa3dit/n/G049_Online_Test_2_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- PS83
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2
HR
3. Magnetism and Magnetic Circuits
STUDY
MATERIALS (Magnetic
Circuits)
G001_Part_1 G001_Part_2 G001_Part_1 G001_Part_2
http://www.filefactory.com/file/cf9b277/n/G001.zip
http://www.filefactory.com/file/c0cc1cd/n/Stage_1_Part_4.zip
ONLINE
MCQ TEST (6)
G001
Test 1
http://www.filefactory.com/file/7c658zyrj9gx/n/G001_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- BDL8L85
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 2 HR x 0.5 = 1
HR
4.AC/DC
Machines
STUDY
MATERIALS (AC/DC
Machines)
Elect
Machine-G043+G044+G045.zip
http://www.filefactory.com/file/c0b6668/n/Elect_Machine-G043_G044_G045.zip
G043_G045_7762AF_Notes G043_G045_Part_1_7762AF_Notes
G015_G046_G040_G043_G045_G042Tutorials
ESI12_14_Syn_Motor_Generator.zip
ESI_13_Voltage_regulation_devices.zip
ESI_19.2_Generator_Control_Load_Flow.zip
Synchronous
Generator
Advanced
AC Machines
AF_Wk_1-2.zip
AF_Wk_2-3.zip
AF_Wk_4.zip
AF_Wk_5.zip
AF_Wk_6.zip
AF_Wk_7.zip
AF_Wk_8.zip
AF_Wk_9.zip
AF_Wk_10.zip
AFWk11-12-13Part1.zip
AFWk11-12-13Part2.zip
AF_Wk_14.zip
AF_Wk_15.zip
AF_Week_16.zip
AF_wk_17.zip
Principle_of_Synchronous_motors.doc
G043_G045_7762AF_Notes G043_G045_Part_1_7762AF_Notes
MachineControlCkt1.zip MachineControlCkt2.zip MachineControlCkt3.zip
Motor
control 2 Motor
control 3
Motor
control 4 Motor
control 5
Motor
control 6 Motor
control 7 Motor
control 8 Motor
control 9
Motor
control 10 Motor
control 11 Motor
control 12 Motor
control 13
Motor
control 14 Motor
control 15 Motor
control 16
E029_Motor_Control_1 E029_Motor_Control_2 E047Mech
Advanced
DC Machines
http://www.filefactory.com/file/cf9a3a6/n/E029.zip
ONLINE
MCQ TEST (7)
G043+G045
Test
http://www.filefactory.com/file/7h9o99zngfq1/n/G043_G045_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- 7TBWXJ5
G044Test
http://www.filefactory.com/file/5iyno92bji67/n/G044_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- VH4D
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2
HR
5.Transformers
STUDY
MATERIALS (Power
Transformer)
Power
Transformer+Line-G040.zip
New-AA_AB_AD_AE_AF_AG_AH_4269T_Tutorials
ESI_4_11_Power_Transformer.zip
7762AD
Power Transformer
AD_Day_1.zip
AD_Day_2.zip
AD_Day_4.zip
AD_Day_5.zip
AD_Day_6.zip
Power
Transformer Reference
TrRef1.zip TrRef2.zip
TrRef3_0.zip
TrRef4.zip
TtrRef5.zip
TRRef6.zip
TrRef7.zip TrRef8.zip TrRef9.zip
ONLINE
MCQ TEST (8)
G040
Test 1
http://www.filefactory.com/file/3ve7iz9640yp/n/G040_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- 67VWMYJ
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 4 HR x 0.5 = 2
HR
6.Active Power and Frequency Control
STUDY
MATERIALS (Power Frequency
Control 1
)
ESI12_14_Syn_Motor_Generator.zip ESI_13_Voltage_regulation_devices.zip
ESI_18.1_Substation_equipments_1.zip
ESI_18.2_Substation_equipments_2.zip
ESI_18.3_Substation_equipments_3.zip ESI_33.3_Harmoniceffect_on_machines.zip
ESI_33.4_Harmonic_in_synchronous_machines.zip
ESI_33.5_Harmonic_in_transformer.zip
ESI_33.6_Power_Quality_Improvement_Capacitor_bank.zip
ESI_33.7_Power_Quality_Improvement-Filter.zip
ESI_33.8_Power_Quality_Improvement-General.zip
ESI_33.9_Power_Quality_Improvement-Power_Conditioner.zip
Stage 2 Part 1A.zip http://www.filefactory.com/file/c0cb96f/n/Stage_2_Part_1A.zip
Stage 2 Part 3.zip http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip
ESI12_14_Harmonic ESI12_14_Reactor ESI12_14_Syn_Motor_Generator
ESI_19.1_Computer_Control ESI_19.4_Turbine_Control
ESI_19.2_Generator_Control_Load_Flow
ESI_19.3_Generator ESI_22.1_Generator_Study ESI_22.2_Voltage_surge_control
Power System
Operation (General aspect) Reading 1
Power System
Operation (General aspect) Reading 2
Power System
Operation (General aspect) Reading 3
Power System
Operation (General aspect) Reading 4
Power System
Operation (General aspect) Reading 5
Power System
Operation (General aspect) Reading
http://kyawnaing325.zoomshare.com/files/7762ElectricalPowerModules.htm
7762AH
Power System Fundamental
7762AH
Power System Fundamental
AH_Day_1.zip
AH_Day_2_3.zip
AH_Day_4.zip
AH_Day_5.zip AH_Day_6_7_8.zip
Stage 3 Part 3.zip http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip
7.Reactive
Power and Frequency Control
STUDY
MATERIALS (Power Frequency
Control
2)
G015_G037_G038_G030Pt1_7762AG_Notes G015_G042_G037_G038_G039_Part_2_Notes
G015_G042_G037_G038_G039_Part_2_Notes G015_G037_G038_G030Pt1_7762AG_Notes
Power system
2-G037+G038+G039.zip
http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip
Power system
2-G037+G038+G039.zip
http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip
http://www.filefactory.com/file/c0b7dad/n/Transmission_line-G042.zip
G042_Part_3_Notes
G037_G038_G030Pt1_7762AG_Notes
ONLINE
MCQ TEST (9)
G037+G038+G039
Test 1
http://www.filefactory.com/file/6o7ow8er4f9l/n/G037_G038_G039_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- HYCEUE
ONLINE
MCQ TEST (10)
G037+G038+G039
Test 2
http://www.filefactory.com/file/5by85g9rxmoh/n/G037_G038_G039_Online_Test_2_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- LCCD
ONLINE
MCQ TEST (11)
G037+G038+G039
Test 3
http://www.filefactory.com/file/5fy0regqoh0n/n/G037_G038_G039_Online_Test_3_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- S947G
ONLINE
MCQ TEST (12)
G037+G038+G039
Test 4
http://www.filefactory.com/file/q1sn4hitpjb/n/G037_G038_G039_Online_Test_4_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- 49JL
ONLINE
MCQ TEST (13)
G037+G038+G039
Test 5
http://www.filefactory.com/file/738vtwzyd3qp/n/G037_G038_G039_Online_Test_5_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code--- KV6K3G
After you have done the test, the score can be
printed out in PDF format The score with at least 50% or more for all tests, it
will be record of 8 HR x 0.5 = 4HR
8.Electric
Power Distribution Systems
STUDY
MATERIALS (Electrical Power
Distribution)
Electrical
Distribution Typed Notes
AA_Typed_Note_1.doc
AA_Typed_Note_2.doc
AA_Typed_Notes_3-.doc
AA_Typed_note_5.doc
AA_Typed_note_6.doc
AA_typed_note_7.doc
AA_typed_note_8.doc
7762AA_Module_Book
Power
System 1-G015+G046+A010
http://www.filefactory.com/file/c0b7e92/n/AA.zip
http://www.filefactory.com/file/c0b7ff7/n/AE.zip
http://www.filefactory.com/file/c0b7f21/n/AG.zip
http://www.filefactory.com/file/c0b7f3c/n/A010.zip
AA_AB_AD_AE_AF_AG_AH_4269T_Tutorials
ESI_25_27_31_32_Part_2_Installation_and_testing_0.zip
ESI_25_27_31_32_Part_3_Electrical_Drawing.zip
ESI_25_27_31_32_Part_4_Data_Com_and_Wiring.zip
ESI_25_27_31_32_Part_5_Installation_Work_Books.zip
ESI_25_27_31_32_Part_6_Switching_1_2.zip
ESI_25_27_31_32_Part_7_Switching_3_4.zip
ESI_25_27_31_32_Part_8a_Electrical_Installation_Requirement_1.zip
ESI_25_27_31_32_Part_8b_Electrical_Installation_Requirement_2.zip
ESI_9.1_Protection_Relay_Construction.zip
Study
Package (10) HV Equipments
ESI10.2_Substation_equipments.zip
Study
Package (12) Harmonics
ESI12_14_Syn_Motor_Generator.zip
Study
Package (13) Voltage Regulation
3333
ESI_13_Voltage_regulation_devices.zip
Study
Package (18) Sub station equipments
ESI_18.1_Substation_equipments_1.zip
ESI_18.2_Substation_equipments_2.zip
ESI_18.3_Substation_equipments_3.zip
Study
Package (33) Power Quality
ESI_33.1_Power_Quality_Concept.zip
ESI_33.2_Harmonic_in_capacitor.zip
ESI_33.3_Harmoniceffect_on_machines.zip
ESI_33.4_Harmonic_in_synchronous_machines.zip
ESI_33.5_Harmonic_in_transformer.zip
ESI_33.6_Power_Quality_Improvement_Capacitor_bank.zip
ESI_33.7_Power_Quality_Improvement-Filter.zip
ESI_33.8_Power_Quality_Improvement-General.zip
ESI_33.9_Power_Quality_Improvement-Power_Conditioner.zip
Study
Package (34) Power Equipments Commissioning
ESI_34.1_Power_Eqpt_Commissioning_1.zip
ESI_34.2_Power_Eqpt_Commissioning_2.zip
ESI_34.3_Power_Eqpt_Commissioning_3.zip
ESI_34.4_Power_Eqpt_Commissioning_4.zip
ESI_34.5_Power_Eqpt_Commissioning_5.zip
ESI_34.6_Power_Eqpt_Commissioning_6.zip
ESI_34.7_Power_Eqpt_Commissioning_Trade_1.zip
ESI_34.8_Power_Eqpt_Commissioning_Trade_2.zip
ESI_34.9_Power_Eqpt_Commissioning_Trade_3.zip
ESI_34.10_Power_Eqpt_Commissioning_Trade_4.zip
ESI_34.11_Power_Eqpt_Commissioning_Trade_5.zip
ESI_34.12_Power_Eqpt_Commissioning_Trade_6.zip
ESI_34.13_Power_Eqpt_Configuration_1.zip
ESI_34.14_Power_Eqpt_Configuration_2.zip
Study
Package (34) Equipments Commissioning ESI_34.1_Background_theory_for_equipments_commissioning_1.zip
ESI_34.2_Background_theory_for_equipments_commissioning_2.zip
ESI_34.3_Background_theory_for_equipments_commissioning_3.zip
ESI_34.4_Background_theory_for_equipments_commissioning_4.zip
ESI_34.5_Background_theory_for_equipments_commissioning_5.zip
ESI_34.6_Background_theory_for_equipments_commissioning_6.zip
BACK
UP FOR 2& 10
Stage 2 Part 1A.zip http://www.filefactory.com/file/c0cb96f/n/Stage_2_Part_1A.zip
Stage 2 Part 3.zip http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip
Switch
Gear
Elect_Installation_Protection_Method_Devices.zip
ESI_27.5_Circuit_Breaker_2.zip
ESI_7_Switching_system_design_consideration.zip
ESI_8.2_Site_Insulation_Surge_Protection.zip
ONLINE
MCQ TEST (14)
G015+G046
Test 1
http://www.filefactory.com/file/50ox6xeklufp/n/G015_G046_Online_Test_1_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code
-----G9UCJ
ONLINE
MCQ TEST (15)
G015+G046
Test 2
http://www.filefactory.com/file/1s822zs1jz89/n/G015_G046_Online_Test_2_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code
-----FSXU
ONLINE
MCQ TEST (16)
G015+G046
Test 3
http://www.filefactory.com/file/6pcivv5e0y05/n/G015_G046_Online_Test_3_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code
-----JE3W
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 4 HR x 0.5=2HR
9.Building
Services Engineering
STUDY
MATERIALS (Building Service
Engineering)
Wiring_Notes_1. Wiring_Notes_2 Switchboard_Wiring
1Wiring_E033_E008
2Wiring_E033_E008
Stage 1 Part 1.zip http://www.filefactory.com/file/c0cb8ab/n/Stage_1_Part_1.zip
Stage 1 Part
5.zip http://www.filefactory.com/file/c0cb9b3/n/Stage_1_Part_5.zip
Stage 1 Part 5.zip http://www.filefactory.com/file/c0cb9b3/n/Stage_1_Part_5.zip
Stage 1 Part 1.zip http://www.filefactory.com/file/c0cb8ab/n/Stage_1_Part_1.zip
ELV_Cable_termination ELV_Cable_termination Wiring_Notes_1.
Wiring_Notes_2
Switchboard_Wiring
1Wiring_E033_E008 2Wiring_E033_E008
ElectricalDrawing1.zip ElectricalDrawing2.zip ElectricalDrawing3.pdf
http://www.filefactory.com/file/c0cca4a/n/Stage_2_Part_2A.zip
Wiring_Notes_1.
Wiring_Notes_2
Switchboard_Wiring 1Wiring_E033_E008 2Wiring_E033_E008
Stage 2 Part 1B.zip
http://www.filefactory.com/file/c0ccac0/n/Stage_2_Part_1B.zip
Stage 2 Part 3.zip http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip
Stage 2 Part 6.zip http://www.filefactory.com/file/c0cccc0/n/Stage_2_Part_6.zip
Stage 3 Part 3.zip http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip
Stage 3 Part 4.zip http://www.filefactory.com/file/c0ccd9a/n/Stage_3_Part_4.zip
Stage 4 Part 8.zip http://www.filefactory.com/file/c0cc5a1/n/Stage_4_Part_8.zip
Stage 4 Part 9.zip http://www.filefactory.com/file/c0cc5db/n/Stage_4_Part_9.zip
Stage 4 Part 10.zip
http://www.filefactory.com/file/c0cc5f8/n/Stage_4_Part_10.zip
Stage 3 Part 5.zip http://www.filefactory.com/file/c0ccefd/n/Stage_3_Part_5.zip
Stage 3 Part 8.zip http://www.filefactory.com/file/c0ccf09/n/Stage_3_Part_8.zip
Stage 3 Part 9.zip http://www.filefactory.com/file/c0ccf48/n/Stage_3_Part_9.zip
|
AS3000_AS3008TablesExtract.zip
Part
(1) Study the following notes Installation_Requirement_1-A.zip
Installation_Requirement_1-B.zip Installation_Requirement_2-A.zip |
|
AS3000_AS3008TablesExtract.zip Part
(1) Study the following notes Installation_Requirement_1-A.zip
Installation_Requirement_1-B.zip
Installation_Requirement_2-A.zip
Installation_Requirement_2-B.zip
|
BACK
UP FOR 9 & 10
Stage 2 Part 1B.zip
http://www.filefactory.com/file/c0ccac0/n/Stage_2_Part_1B.zip
Stage 2 Part 3.zip http://www.filefactory.com/file/c0ccb1f/n/Stage_2_Part_3.zip
Stage 2 Part 6.zip http://www.filefactory.com/file/c0cccc0/n/Stage_2_Part_6.zip
Stage 3 Part 3.zip http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip
Stage 3 Part 4.zip http://www.filefactory.com/file/c0ccd9a/n/Stage_3_Part_4.zip
Stage 3 Part
5.ziphttp://www.filefactory.com/file/c0ccefd/n/Stage_3_Part_5.zip
Stage 3 Part 8.zip http://www.filefactory.com/file/c0ccf09/n/Stage_3_Part_8.zip
Stage 3 Part 9.zip http://www.filefactory.com/file/c0ccf48/n/Stage_3_Part_9.zip
Stage 4 Part
7.ziphttp://www.filefactory.com/file/c0cc479/n/Stage_4_Part_7.zip
Stage 4 Part 8.zip http://www.filefactory.com/file/c0cc5a1/n/Stage_4_Part_8.zip
Stage 4 Part 9.zip http://www.filefactory.com/file/c0cc5db/n/Stage_4_Part_9.zip
Stage 4 Part 10.zip
http://www.filefactory.com/file/c0cc5f8/n/Stage_4_Part_10.zip
|
G103+104
Notes+Lessons http://www.filefactory.com/file/2bg8qift6nzh/n/G103_G104_zip |
Wiring_Notes_1. Wiring_Notes_2 Switchboard_Wiring
1Wiring_E033_E008
2Wiring_E033_E008
Fixing Equipments
E_trade_1.zip E_trade_2.zip E_trade_3.zip E_trade_4.zip
G008_General_Notes_1.zip G008_General_Notes_2.zip G003_G004_Wiring_2_Part_1.zip
G003_G004_Wiring_2_Part_2.zip Cable_CktProt_E_Accessories.zip
Cable_Conduit_E_Accessories.zip Elect_Installation_Protection_Method_Devices.zip Elect_Installation_Requirement_1.zip Elect_Installation_Requirement_1.zip
Elect_Installation_Requirement_2.zip
ElectricInstallationDesign.zip
ElectSystSafety1.zip
ElectSystSafety2.zip
FireProtHeatingTestingEarthing.zip GeneralWiring.zip
HazardLightingPanel.zip
|
http://www.filefactory.com/file/c392ae1/n/Electrician_Capstone_unit.pdf
Electrician Capstone Test Old
Questions
Electrician Capstone Unit
Study Guide.zip
http://www.filefactory.com/file/c4bbf1b/n/Electrician_Capstone_Unit_Study_Guide.zip
ONLINEASSESSMENT
(17)
Reflect your experience in the work place , write
the technical report of 10 pages
& submit it.
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 4 HR x 0.5 =
2HR
10.General
Protections
STUDY
MATERIALS (General Protection
Principles)
http://www.filefactory.com/file/c0b7ff7/n/AE.zip
G015_G042_G037_G038_G039_Part_2_Notes
ESI_27.1_Arts_and_Science_of_Protective_Relaying_1.zip
ESI_27.2_Arts_and_Science_of_Protective_Relaying_2.zip
ESI_27.3_Arts_and_Science_of_Protective_Relaying_3.zip
ESI_27.4Circuit_Breaker_1.zip ESI_27.5_Circuit_Breaker_2.zip
ESI_27_1_Relay_Principle_1.zip ESI_27_1_Relay_Principle_2.zip
ESI_27_1_Relay_Principle_3.zip ESI_27.2_Element_of_Relay_Protection.zip
ESI_27.3_Relay_operation_characteristics.zip ESI_27.4_Relay_connection_and_response.zip
ESI_27.5_Machine_and_busbar_protection_1.zip ESI_27.5_Machine_and_busbar_protection_2.zip
ESI_27.5_Machine_and_busbar_protection_3.zip
ESI_27.6_Feeder_protection.zip ESI_27.7_CT_and_PT.zip
ESI_27.9_Comparator.zip
ESI_27.10_Static_relay.zip ESI_27.11_Test_and_maintenance.zip
ESI_27.12_Circuit_Breaker_1.zip ESI_27.12_Circuit_Breaker_2.zip
ESI_27.12_Circuit_Breaker_3.zip ESI_27.12_Circuit_Breaker_4.zip
ESI_27.8_Line_protection_1.zip ESI_27.8_Line_protection_2.zip
ESI_27.8_Line_protection_3.zip ESI_27.5_Machine_and_busbar_protection_2_0.zip
ONLINE
MCQ TEST (18)
G015+G046
Test 4
http://www.filefactory.com/file/4obspr3n1fkf/n/G015_G046_Online_Test_4_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code
-----CCLV2SN
ONLINE
MCQ TEST (19)
G015+G046
Test 5
http://www.filefactory.com/file/5t1q4kveec4v/n/G015_G046_Online_Test_5_Question_pdf
First
Name-Enter your full name &
Surname- Enter Myanmar Engineering Society Membership Number
Enter
the code
-----T6X5982
After
you have done the test, the score can be printed out in PDF format The score
with at least 50% or more for all tests, it will be record of 2 HR x 0.5 =
1HR
TOTAL
PROFESSIONAL DEVELOPMENT PROGRAM (PDP) HOURS = 20 Hours
For Year 1 &
SCOPE
Electrical PE (Building Services)
PART (2)
YEAR
3 & 4 (Minumum
3 to 4 years is required for a graduate to become a
PE)
The
practice reports need to write for each topics of the study materials included
in Scope Part II.
The
reports should include the followings:
·
Professional
topics----- You need to select the topic such as building electrical wiring or
power distribution etc
·
Fundamental
of Engineering- What knowledge you got from the materials in your selected
professional topic..
·
Engineering
Management--- How will you manage the l project / workforce to implement the
engineering tasks by applying those knowledge in actual workplace project or
simulated work place and project?.
·
Rules
Regulations, Standards & Specifications- You need to refer the relevant
engineering rules, regulations, standards and specifications in the tasks
expressed in your report.
·
Safety—How
will you safeguard public safety in performing the engineering
tasks?
·
Ethics---
How will you apply professional code of ethics in performing
the engineering tasks?
The
candidate should use the following format in the practice exercise reports for
each topics of the Scope II that are simulated practice tasks for preparing the
Professional Experience and Competency Report to be submitted to Myanmar
Engineers Board for Professional Engineer (PE)
Registration.
Section
(1) Introduction
Section
(2) Work experiences in brief and highlight the major important
projects
Section
3 to 10 , the following competency
should be addressed
·
Apply
engineering knowledge, methods and techniques
·
Use
of engineering technology , tools and equipments
·
Safeguard
public safety
·
Recognition
the impacts of engineering on the environment , economy and
society.
·
Manage
engineering activities
·
Communicate
engineering information.
·
Work
collaboratively
·
Main
and enhance engineering skills and knowledge. ( Ref-MEB PEng
Reg)
1.Electrical
Power Supply
STUDY
MATERIALS (Electrical Power
Supply)
G008_General_Notes_1.zip
G008_General_Notes_2.zip
MachineControlCkt1.zip MachineControlCkt2.zip
MachineControlCkt3.zip
MachineRepair1.zip
MachineRepair2.zip MachineRepair3.zip ProcessControlCkt1.zip
ProcessControlCkt2.zip ProcessControlCkt3.zip
ESI_8_Insulation_1
ESI_8_Insulation_2
ESI_9.1_Protection_Relay_Construction
ESI_9.2Test_Equipment ESI_33.1_Power_Quality_Concept
ESI_33.2_Harmonic_in_capacitor
ESI_33.3_Harmoniceffect_on_machines
ESI_3.1_HV_Measurement_Cable_Test.zip
ESI_3.2_Magnetic_measurement.zip
ESI_3.3_Power_measurement.zip
ESI_3.4_RLC_measurement_1.zip
ESI_3.4_RLC_measurement_2.zip
ESI_3.4_RLC_measurement_3.zip
ESI_3.5_Digital_equipments.zip
ESI_3.6_V.A.W_meter.zip
ESI_3.7T_and_M.zip ESI_3.8_Thermography.zip
ESI_4_11_Power_Transformer.zip
ESI_5_Machinery_Installation.zip ESI_7_Drawing_Switching_Diagram.zip
ESI_7_Electrical_Installation_Design.zip ESI10.1_HV_equipments.zip
ESI10.2_Substation_equipments.zip ESI12_14_Harmonic.zip
ESI12_14_Reactor.zip ESI12_14_Syn_Motor_Generator.zip
ESI_13_Voltage_regulation_devices.zip
Power system
2-G037+G038+G039.zip
http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip
ESI12_14_Harmonic ESI12_14_Reactor ESI12_14_Syn_Motor_Generator
ESI_19.1_Computer_Control ESI_19.4_Turbine_Control
ESI_19.2_Generator_Control_Load_Flow
ESI_19.3_Generator ESI_22.1_Generator_Study ESI_22.2_Voltage_surge_control
2.bUnintentional_islanding_in_distribution_grids_with_a_high_penetration_of_inverter-based_DG.mht
2.Un
intentional islanding in distribution grids-Part 2 2.c.pdf
2.Un
intentional islanding in distribution grids-Part 3 2.d-1.pdf
2.Distribution
Network 1 2b_Distribution_Network.pdf
2.Distribution
Network 2 2d-2.pdf
2.Distribution Network 3 2d-3.pdf
ESI_22.2_Voltage_surge_control.zip
ESI_33.5_Harmonic_in_transformer.zip
ESI_33.6_Power_Quality_Improvement_Capacitor_bank.zip
ESI_33.7_Power_Quality_Improvement-Filter.zip
ESI_33.8_Power_Quality_Improvement-General.zip
ESI_33.9_Power_Quality_Improvement-Power_Conditioner.zip
ESI_25_27_31_32_Part_2_Installation_and_testing_0.zip
ESI_25_27_31_32_Part_3_Electrical_Drawing.zip
ESI_25_27_31_32_Part_4_Data_Com_and_Wiring.zip
ESI_25_27_31_32_Part_5_Installation_Work_Books.zip
ESI_25_27_31_32_Part_6_Switching_1_2.zip
ESI_25_27_31_32_Part_7_Switching_3_4.zip
ESI_25_27_31_32_Part_8a_Electrical_Installation_Requirement_1.zip
ESI_25_27_31_32_Part_8b_Electrical_Installation_Requirement_2.zip
ESI_13_Voltage_Regulating_Devices.zip
ESI_27.9_Comparator.zip ESI_27.10_Static_relay.zip ESI_27.11_Test_and_maintenance.zip
Advanced
Diploma in Electricity Supply Industry (ESI)
The LINK for
Study Package
(2)-Power System Planning
Study Package
(3)-Testing
The LINK for
Study Package
(16+17)-OHS
Study Package
(20) Transmission System
Study Package
(28) Power Accessories
The LINK for
Study Package
(23) Machine Rating
The LINK for
Study Package
(5) Machine Installation
Study Package
(9) Protection
The LINK for
Study Package
(3)-Testing
Study Package
(5) Machine Installation
Study Package
(15) Electrical Estimating
The LINK for
Study Package
(1)-OHS
Study Package
(12) Harmonics
Study Package
(19) Computer Control
Study Package
(20) Transmission System
The LINK for
Study Package
(4) Power Transformer
Study Package
(7) Drawing
Study Package
(21+34)-Electrical Distribution
The LINK for
Study Package
(10) HV Equipments
Study Package
(18) Sub station equipments
The LINK for
Study Package
(12) Harmonics
Study Package
(22) Generator
Study Package
(24) Signal Communication
The LINK for
Study Package
(19) Generator
Study Package
(25+27+31+32) Installation & Testing
The LINK for
Study Package
(9) Protection
Study Package
(16+17)-OHS
The LINK for
Study Package
(22) Generator
The LINK for
Study Package
(34) Power Equipments Commissioning
Study Package
(21+34)-Electrical Distribution
The LINK for
Study Package
(26) (41)
The LINK for
Study Package
(6+ 10) HV Equipments
The LINK for
Study Package
(7) Drawing
Study Package
(8) Insulation
Study Package
(13) Voltage Regulation
The LINK for
Study Package
(15) Electrical Estimating
Study Package
(15) Transmission System
Study Package
(25+27+31+32) Installation & Testing
The LINK for
Study Package
(18) Sub station equipments
Study Package
(28) Power Accessories
The LINK for
Study Package
(24) Modern Power System
The LINK for
Study Package
(33) Power Quality
The LINK for
Study Package
(27) Relay
The LINK for
Study Package
(13) Voltage Regulation
The LINK for
Study Package
(35)
The LINK for
Study Package
(34) Equipments Commissioning
The LINK for
Study Package
(8) Insulation
Study Package
(12) Harmonics
The LINK for
Study Package
(25+27+31+32) Installation & Testing
Study Package
(25+27+31+32) Installation & Testing
The LINK for
Study Package
(27) Relay
The LINK for
Study
Package (20) Transmission System
EXERCISE
ASSESSMENT (20)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in electrical power supply in above
mentioned format & submit it to the assessor.
( Weighted informal learning time for CPD including study & report=
20Hr x 0.5= 10Hr)
2.Lighting
Requirement for Workplace , Indoor and Outdoor
STUDY
MATERIALS (Lighting Requirement
)
Lighting.zip
E_trade_1.zip
E_trade_2.zip
E_trade_3.zip
E_trade_4.zip
G008_General_Notes_1.zip G008_General_Notes_2.zip
Hazard_Identification.zip
K041
Lesson 16-Energy efficiency+Lighting.zip
http://www.filefactory.com/file/c0b6e0f/n/K041_Lesson_16-Energy_efficiency_Lighting.zip
K041
Lesson 17-Illumination+Smoke alarm.zip
http://www.filefactory.com/file/c0b6fc5/n/K041_Lesson_17-Illumination_Smoke_alarm.zip
EXERCISE
ASSESSMENT (21)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in workplace lighting in above
mentioned format & submit it to the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
3.Energy
Efficiency Requirement
STUDY
MATERIALS (Energy
Efficiency)
Building
Design+Material Science-K041+E047.zip http://www.filefactory.com/file/c0b645d/n/Building_Design_Material_Science-K041_E047.zip |
K041Textbook1.zip K041Textbook2.zip K041Textbook3.zip
EXERCISE
ASSESSMENT (22)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in energy efficiency in above
mentioned format & submit it to the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
4.Protection
for Safety
STUDY
MATERIALS (Protection for
Safety)
G033 http://www.filefactory.com/file/1b2utxydvcx7/n/G033_zip |
Wiring_Notes_2 Switchboard_Wiring
1Wiring_E033_E008 2Wiring_E033_E008
Fixing Equipments
Cable_CktProt_E_Accessories.zip Cable_Conduit_E_Accessories.zip Elect_Installation_Protection_Method_Devices.zip Elect_Installation_Requirement_1.zip Elect_Installation_Requirement_1.zip Elect_Installation_Requirement_2.zip
ElectricInstallationDesign.zip
FireProtHeatingTestingEarthing.zip
|
G008_General_Notes_1.zip
G008_General_Notes_2.zip
MachineControlCkt1.zip MachineControlCkt2.zip
MachineControlCkt3.zip
MachineRepair1.zip
MachineRepair2.zip MachineRepair3.zip ProcessControlCkt1.zip
ProcessControlCkt2.zip ProcessControlCkt3.zip
ESI_8_Insulation_1
ESI_8_Insulation_2
ESI_9.1_Protection_Relay_Construction
ESI_9.2Test_Equipment ESI_33.1_Power_Quality_Concept
ESI_33.2_Harmonic_in_capacitor
ESI_33.3_Harmoniceffect_on_machines
ESI_3.1_HV_Measurement_Cable_Test.zip
ESI_3.2_Magnetic_measurement.zip
ESI_3.3_Power_measurement.zip
ESI_3.4_RLC_measurement_1.zip
ESI_3.4_RLC_measurement_2.zip
ESI_3.5_Digital_equipments.zip
ESI_3.6_V.A.W_meter.zip
ESI_3.7T_and_M.zip
ESI_4_11_Power_Transformer.zip
ESI_5_Machinery_Installation.zip
ESI_7_Drawing_Switching_Diagram.zip ESI_7_Electrical_Installation_Design.zip
ESI10.1_HV_equipments.zip
ESI10.2_Substation_equipments.zip
ESI12_14_Harmonic.zip ESI12_14_Reactor.zip
ESI12_14_Syn_Motor_Generator.zip ESI_13_Voltage_regulation_devices.zip
BACK
UP FOR 4
Stage 3 Part 3.zip http://www.filefactory.com/file/c0ccd44/n/Stage_3_Part_3.zip
Stage
4 Part 15.zip http://www.filefactory.com/file/c0cc7cb/n/Stage_4_Part_15.zip
Stage 4 Part 17.zip
http://www.filefactory.com/file/c0cc76b/n/Stage_4_Part_17.zip
Stage 4 Part 7.zip http://www.filefactory.com/file/c0cc479/n/Stage_4_Part_7.zip
Stage
4 Part 14.zip http://www.filefactory.com/file/c0cc684/n/Stage_4_Part_14.zip
Study
Package (19) Generator
Study
Package (28) Power Accessories
ESI_28.1_Power_Accessories_1.zip ESI_28.2_Power_Accessories_2.zip
ESI_28.3_Power_Accessories_3.zip ESI_28.4_Power_Accessories_4.zip
ESI_28.5_Power_Accessories_5.zip ESI_28.6_Power_Accessories_6.zip
Study
Package (34) Equipments Commissioning
ESI_34.1_Background_theory_for_equipments_commissioning_1.zip
ESI_34.2_Background_theory_for_equipments_commissioning_2.zip
ESI_34.3_Background_theory_for_equipments_commissioning_3.zip
ESI_34.4_Background_theory_for_equipments_commissioning_4.zip
ESI_34.5_Background_theory_for_equipments_commissioning_5.zip
ESI_34.6_Background_theory_for_equipments_commissioning_6.zip
Study
Package (27) Relay
ESI_27_1_Relay_Principle_1.zip ESI_27_1_Relay_Principle_2.zip
ESI_27_1_Relay_Principle_3.zip
ESI_27.2_Element_of_Relay_Protection.zip
ESI_27.3_Relay_operation_characteristics.zip ESI_27.4_Relay_connection_and_response.zip
ESI_27.5_Machine_and_busbar_protection_1.zip ESI_27.5_Machine_and_busbar_protection_2.zip
ESI_27.5_Machine_and_busbar_protection_3.zip
ESI_27.6_Feeder_protection.zip ESI_27.7_CT_and_PT.zip
ESI_27.9_Comparator.zip
ESI_27.10_Static_relay.zip ESI_27.11_Test_and_maintenance.zip
ESI_27.12_Circuit_Breaker_1.zip ESI_27.12_Circuit_Breaker_2.zip
ESI_27.12_Circuit_Breaker_3.zip ESI_27.12_Circuit_Breaker_4.zip
ESI_27.8_Line_protection_1.zip ESI_27.8_Line_protection_2.zip
ESI_27.8_Line_protection_3.zip ESI_27.5_Machine_and_busbar_protection_2_0.zip
EXERCISE
ASSESSMENT (23)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in protection and safety in above
mentioned format & submit it to the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
5.Cables,Bus-ways
and Distribution Boards
STUDY
MATERIALS (Electrical
Installation)
|
AS3000-2007Overview.zip AS3000_AS3008TablesExtract.zip
WiringRules.zip
Part
(1) Study the following notes Installation_Requirement_1-A.zip Installation_Requirement_1-B.zip Installation_Requirement_2-A.zip Installation_Requirement_2-B.zip |
Cable_CktProt_E_Accessories.zip
Cable_Conduit_E_Accessories.zip
Elect_Installation_Protection_Method_Devices.zip
Elect_Installation_Requirement_1.zip
Elect_Installation_Requirement_1.zip
Elect_Installation_Requirement_2.zip
ElectricInstallationDesign.zip
FireProtHeatingTestingEarthing.zip
PanelRCDWireSpecial_Installation.zip
Assessment
Read
the above notes files and do the assignments for the following tutorial
file.
PRACTICAL
Workshop
2+3
WorkShop_Part_2_Practical_1_to_6_.zip WorkShop_Part_2_Practical_7_to_12_.zip
WorkShop_Part_2_Practical_13_to_17_.zip WorkShop_Part_2_Practical_18_to_21_.zip
ElectricalWorkshopPart3_G008_Group1Machine_.zip
ElectricalWorkshopPart3_G008_Group2LineProtection_.zip
ElectricalWorkshopPart3_G008_Group3InstrumentsDevices_.zip
OTHER
PRACTICALS
ELECTRICAL_WORKSHOP_PART_2_G003_G004_G009_.zip
Electrical_Workshop_Part_2_Practical_1_to_18.zip
Electrical_Workshop_Part_2_Practical_19_to_21.zip
G005
UEENEEG005B
|
Verify
compliance and functionality of general electrical installations
|
Power
Distribution Trade
Metering
Switch
Gear
Elect_Installation_Protection_Method_Devices.zip
ElectSystSafety1.zip ElectSystSafety2.zip
7762AH
Power System Fundamental
AH_Day_1.zip
AH_Day_2_3.zip
AH_Day_4.zip
AH_Day_5.zip
AH_Day_6_7_8.zip
ESI_27.4Circuit_Breaker_1.zip ESI_27.5_Circuit_Breaker_2.zip
ESI_7_Switching_system_design_consideration.zip ESI_8.2_Site_Insulation_Surge_Protection.zip
EXERCISE
ASSESSMENT (24)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in electrical installation in above
mentioned format & submit it to the assessor.
( Weighted informal
learning time for CPD including study & report= 20Hr x 0.5=
10Hr)
6.Earthing
STUDY
MATERIALS (Electrical
Earthing)
G007
G007
Lesson 1 AS3000 Wiring rule overview.zip
http://www.filefactory.com/file/cf94220/n/G007_Lesson_1_AS3000_Wiring_rule_overview.zip
G007
Lesson 2 Maximum Demand calculation.zip
http://www.filefactory.com/file/cf9456f/n/G007_Lesson_2_Maximum_Demand_calculation.zip
G007
Lesson 3 Cable selection.zip
http://www.filefactory.com/file/cf9465c/n/G007_Lesson_3_Cable_selection.zip
G007
Lesson 4 Cable voltage drop calculation.zip
http://www.filefactory.com/file/cf9479e/n/G007_Lesson_4_Cable_voltage_drop_calculation.zip
G007
Lesson 5 Derating of cable part 1.zip
http://www.filefactory.com/file/cf95acb/n/G007_Lesson_5_Derating_of_cable_part_1.zip
G007
Lesson 6 Derating of cable part 2.zip
http://www.filefactory.com/file/cf95a6b/n/G007_Lesson_6_Derating_of_cable_part_2.zip
G007
Lesson 7 Derating of cable for HRC fuse protection.zip
http://www.filefactory.com/file/cf95cd7/n/G007_Lesson_7_Derating_of_cable_for_HRC_fuse_protection.zip
G007
Lesson 8 Final subcircuit fault loop impedance.zip
http://www.filefactory.com/file/cf95dd1/n/G007_Lesson_8_Final_subcircuit_fault_loop_impedance.zip
Electrical Installation
requirement
FireProtHeatingTestingEarthing.zip
PanelRCDWireSpecial_Installation.zip
ESI_8.2_Site_Insulation_Surge_Protection.zip
Power system
2-G037+G038+G039.zip
http://www.filefactory.com/file/c0b7a33/n/Power_system_2-G037_G038_G039.zip
G037+G038+G039 Lesson 2-Site
Earthing.zip
http://www.filefactory.com/file/c0bb244/n/G037_G038_G039_Lesson_2-Site_Earthing.zip
G037+G038+G039 Lesson 8-Turbine Control+Power Line
Earthing.zip
G037+G038+G039
Lesson 9-Insulator.zip
http://www.filefactory.com/file/c221eff/n/G037_G038_G039_Lesson_9-Insulator.zip
Power
System (2)
G037+G038+G039 Lesson 1-Power Flow.zip
http://www.filefactory.com/file/c0bb2a3/n/G037_G038_G039_Lesson_1-Power_Flow.zip
G037+G038+G039 Lesson 2-Site Earthing.zip
http://www.filefactory.com/file/c0bb244/n/G037_G038_G039_Lesson_2-Site_Earthing.zip
G037+G038+G039 Lesson 4-Auxiliary
System+Harmonic.zip
http://www.filefactory.com/file/c0bb3c3/n/G037_G038_G039_Lesson_4-Auxiliary_System_Harmonic.zip
G037+G038+G039 Lesson 3-Power System Control
Equipments.zip
G037+G038+G039 Lesson 5-Harmonic.zip
http://www.filefactory.com/file/c0bb35b/n/G037_G038_G039_Lesson_5-Harmonic.zip
G037+G038+G039 Lesson 6-Harmonic Calculation.zip
http://www.filefactory.com/file/c0bb43f/n/G037_G038_G039_Lesson_6-Harmonic_Calculation.zip
G037+G038+G039 Lesson 7-Synchronous Generator
Loading.zip
http://www.filefactory.com/file/c0bb49d/n/G037_G038_G039_Lesson_7-Synchronous_Generator_Loading.zip
G037+G038+G039 Lesson 8-Turbine Control+Power Line
Earthing.zip
G037+G038+G039
Lesson 9-Insulator.zip
http://www.filefactory.com/file/c221eff/n/G037_G038_G039_Lesson_9-Insulator.zip
G037+G038+G039 Lesson 10-Reliability of Power
System.zip
http://www.filefactory.com/file/c0bb6e4/n/G037_G038_G039_Lesson_10-Reliability_of_Power_System.zip
G037+G038+G039 Lesson 11-Harmonic Reduction.zip
http://www.filefactory.com/file/c0bce89/n/G037_G038_G039_Lesson_11-Harmonic_Reduction.zip
G037+G038+G039 Lesson 12-Grounding + Power Quality.zip
http://www.filefactory.com/file/c0bb872/n/G037_G038_G039_Lesson_12-Grounding_Power_Quality.zip
G037+G038+G039 Lesson 13-Power Quality.zip
http://www.filefactory.com/file/c0bb98d/n/G037_G038_G039_Lesson_13-Power_Quality.zip
G037+G038+G039 Lesson 14-Harmonic Model.zip
http://www.filefactory.com/file/c0bcad7/n/G037_G038_G039_Lesson_14-Harmonic_Model.zip
G037+G038+G039 Lesson 15-Harmonic Losses in Transformer.zip
G037+G038+G039 Lesson 16-Reliability Improvement.zip
http://www.filefactory.com/file/c0bcba0/n/G037_G038_G039_Lesson_16-Reliability_Improvement.zip
G037+G038+G039 Lesson 17-Preparation for emergency.zip
http://www.filefactory.com/file/c0bcbd7/n/G037_G038_G039_Lesson_17-Preparation_for_emergency.zip
G037+G038+G039 Lesson 18-Harmonic problems.zip
http://www.filefactory.com/file/c0bcb68/n/G037_G038_G039_Lesson_18-Harmonic_problems.zip
G037+G038+G039 Lesson 19-Synchronous machine problems.zip
http://www.filefactory.com/file/c0bccb8/n/G037_G038_G039_Lesson_19-Synchronous_machine_problems.zip
G037+G038+G039 Lesson 20-Power Generation + Generator
Control.zip
G037+G038+G039 Lesson 21-Turbine Control+ Digital
Excitation.zip
G037+G038+G039 Lesson 22-Power System Protection.zip
http://www.filefactory.com/file/c0bcd4c/n/G037_G038_G039_Lesson_22-Power_System_Protection.zip
G037+G038+G039 Lesson 23-Switch Gear.zip
http://www.filefactory.com/file/c0bcea8/n/G037_G038_G039_Lesson_23-Switch_Gear.zip
EXERCISE
ASSESSMENT (25)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in site earthing in above mentioned
format & submit it to the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
7.Emergency
Lighting
STUDY
MATERIALS (Emergency
Lighting)
EE 617 Building Electrical and Mechanical System Part 1 ( 1 pt)
EE 617 Building Electrical and Mechanical System Part 2
BAE
606 Building Service Electrical & Mechanical
Engineering
E_trade_1.zip
E_trade_2.zip
E_trade_3.zip
E_trade_4.zip
EXERCISE
ASSESSMENT (26)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in emergency lighting in above
mentioned format & submit it to the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
8.Standby
Power Generator System
STUDY
MATERIALS (Standby Power
GeneratorSystem)
Study
Package (22) Generator
ESI_22.2_Voltage_surge_control.zip
Study
Package (23) Machine Rating
ESI_23.1_Transformer_Rating.zip
Study
Package (24) Modern Power System
ESI_24_Modern_Power_System.zip
EE 512 Electrical Power Generation System ( 1 pt)
EE 512 Principles of Power Systems
EE 512 Generation Transmission and Distribution of Electrical Power
EXERCISE
ASSESSMENT (27)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in stand by power system in above
mentioned format & submit it to the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
9.Automatic
Fire Alarm System
STUDY
MATERIALS (Automatic Fire Alarm
System)
Part 1 Over all Knowledge of
the subject
BAE
606 Building Service Electrical & Mechanical
Engineering
Part 2 Competency units of the
subject
Building Electrical
& Mechanical System
EE 617 Building Electrical and Mechanical System Part 1 ( 1 pt)
EE 617 Building Electrical and Mechanical System Part 2
ADDITIONAL
STUDY FOR AUTOMATIC FIRE ALARM SYSTEM
Contact: highlightcomputergroup1@gmail.com
to request the URL for download
10.Emergency
Voice Communication System
STUDY
MATERIALS (Emergency Voice
Communication System)
Study
Package (24) Signal Communication
ESI_26_Electronics_Signals.zip
FireProtHeatingTestingEarthing.zip
E071Hazard_Identification_Wk6_.zip
EXERCISE
ASSESSMENT (28)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in emergency voice communication
system in above mentioned format & submit it to the
assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
ADDITIONAL
STUDY FOR EMERGENCY VOICE
COMMUNICATION
Contact: highlightcomputergroup1@gmail.com
to request the URL for download
11.Inspection,
Testing and Common Violation in Electrical Installation
STUDY
MATERIALS (Electrical Testing
& Inspection)
Project Risk Management
References
http://www.filefactory.com/file/c392ae1/n/Electrician_Capstone_unit.pdf
Electrician Capstone Test Old
Questions
Electrician Capstone Unit
Study Guide.zip
http://www.filefactory.com/file/c4bbf1b/n/Electrician_Capstone_Unit_Study_Guide.zip
UEENEEE033
AS3000_AS3008TablesExtract.zip
Part
(1) Study the following notes
Installation_Requirement_1-A.zip
Installation_Requirement_1-B.zip
Installation_Requirement_2-A.zip
Installation_Requirement_2-B.zip
Protection_1.zip Protection_2.zip
System_safety_1.zip System_safety_2.zip
FireProtHeatingTestingEarthing.zip
EXERCISE
ASSESSMENT (29)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in electrical safety inspection and
testing in above mentioned format & submit it to the
assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)
12.Measuring
Instruments
STUDY
MATERIALS (Electrical
Measurement)
EE 404 Electrical Measurement ( 1 pt)
EXERCISE
ASSESSMENT (30)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in electrical measurement and
testing in above mentioned format & submit it to the
assessor.
( Weighted informal learning time for CPD including study & report= 20Hr x 0.5= 10Hr)
13.Electrical Engineering Codes/ Standards
STUDY
MATERIALS (Electrical Engineering
Code and Standard)
MYANMAR
Myanmar
Electrical Regulations
UK
Electrical
Building Services IEE based
Domestic
Electric Wiring BS7671_2008
Handbook
of Electrical Installation Practice UK
USA
Handbook
of Electrical Design Details
IEC
Electrical
Engineer Portable Handbook (IEC)
AUSTRALIA
& NEW ZEALAND
Australian
Electrical Wiring Rules Part 1
Australian
Electrical Wiring Rules Part 2
Australian
Electrical Wiring Rules Part 3
New
South Wales Electrical Service Rules
Australia
OTHERS
Handbook
of Electrical Design Details
Newnes
Electrical Power Engineer Handbook
Newnes_Electrical_Engineers_Handbook
Power
Fault Calculation & Protection Cable
Selection_Note
REFERENCES
Service_Rule_1
Service_Rule_2 Service_Rule_3
AS3000
Wiring Rules Overview
AS3000_AS3008TablesExtract.zip
E071DesiE071HVOverheadConductors_Wk2-3_.zip
E071LVOverheadConductor_Wk4-5_.zip
E071Hazard_Identification_Wk6_.zip
E071UGCableSpecification_Wk9-10-11_.zip
E071DesignStdOHDevelopment_Wk14-16_.zip
BACK
UP FOR 2, 6 &
10 Stage 4
Part 7.zip
http://www.filefactory.com/file/c0cc479/n/Stage_4_Part_7.zip Stage 4
Part 11.zip
http://www.filefactory.com/file/c0cc540/n/Stage_4_Part_11.zip Stage 4
Part 12.zip
http://www.filefactory.com/file/c0cc566/n/Stage_4_Part_12.zip Stage 4
Part 13.zip
http://www.filefactory.com/file/c0cc6c1/n/Stage_4_Part_13.zip |
http://www.filefactory.com/file/c392ae1/n/Electrician_Capstone_unit.pdf
Electrician Capstone Test Old
Questions
Electrician
Capstone Unit Study Guide.zip
http://www.filefactory.com/file/c4bbf1b/n/Electrician_Capstone_Unit_Study_Guide.zip
OTHERS
REFERENCES
E_trade_1.zip
E_trade_2.zip
E_trade_3.zip
E_trade_4.zip
G008_General_Notes_1.zip G008_General_Notes_2.zip
Part
(1) Study the following notes
Installation_Requirement_1-A.zip
Installation_Requirement_1-B.zip
Installation_Requirement_2-A.zip
Installation_Requirement_2-B.zip
Do
the assignments from the following book & submit the assignment
(1)
Assignment:
At the end of each chapter, there are review questions & exercises. You need
to do all exercises & submit them as assignment
Part (2) Study the following
notes
Protection_1.zip Protection_2.zip System_safety_1.zip System_safety_2.zip
Do
the assignments from the following book & submit the assignment
(2)
Assignment:
At the end of each chapter, there are review questions & exercises. You need
to do all exercises & submit them as assignment
Tutorial
review questions and answers
Electrical_trade_review_questions_and_answers.zip
http://www.filefactory.com/file/c0cccc0/n/Stage_2_Part_6.zip
Stage_1_Wiring_Practical
Stage_2_Wiring
System_Installation_Examples_-_NUER02_version
System_safety_1
System_safety_2 |
OTHER
REFERENCES
UEENEEG003B
|
|
Install
wiring and accessories for low voltage circuits
|
UEENEEG004B
|
|
Install
low voltage electrical apparatus and associated equipment
|
G003_G004_Wiring_2_Part_2.zip
http://www.filefactory.com/file/c0ccc42/n/Stage_3_Part_1B.zip
Cable_CktProt_E_Accessories
Cable_Conduit_E_Accessories
|
http://www.filefactory.com/file/c0cc5a1/n/Stage_4_Part_8.zip
Cable+CktProt+E
Accessories
Cable+Conduit+E
Accessories
Elect
Installation Protection Method Devices
http://www.filefactory.com/file/c0cc5db/n/Stage_4_Part_9.zip
G003+G004
Notes Upload
Cable_CktProt_E_Accessories.zip
Cable_Conduit_E_Accessories.zip
Elect_Installation_Protection_Method_Devices.zip
Elect_Installation_Requirement_1.zip
Elect_Installation_Requirement_1.zip
Elect_Installation_Requirement_2.zip
ElectricInstallationDesign.zip
http://www.filefactory.com/file/c0ccefd/n/Stage_3_Part_5.zip
ElectSystSafety1 ElectSystSafety2 Energy
survey assignment FireProtHeatingTestingEarthing G003_G004_G009Practicals G003_G004_Wiring_2_Part_1 G003_G004_Wiring_2_Part_2 G003G004Tutorial G005
|
FireProtHeatingTestingEarthing.zip
PanelRCDWireSpecial_Installation.zip
Assessment
Read
the above notes files and do the assignments for the following tutorial
file.
http://www.filefactory.com/file/c0ccf48/n/Stage_3_Part_9.zip
WiringPracticals
WorkShop_Part_2_Practical_1_to_6_
WorkShop_Part_2_Practical_7_to_12_
WorkShop_Part_2_Practical_13_to_17_
WorkShop_Part_2_Practical_18_to_21_
|
EXERCISE
ASSESSMENT (31)
Based
on the study you got from the above resources, write a professional experiences
and competency report for engineering tasks in electrical engineering codes and
standards used in engineering work in above mentioned format & submit it to
the assessor.
(
Weighted informal learning time for CPD including study & report= 20Hr x
0.5= 10Hr)